To the central content area

2009 Management and Control Project of Construction Sites and Fugitive Emission in Tainan County.

Absrtact
2009 Management and Control Project of Construction Sites and Fugitive Emission in Tainan County which followed the past years’ rountin on inspecting the construction sites and promoted latest relvent regulations. Until Mid-Term of this project, from Sep. 29, 2009 to Sep 28, 2010, this project completed objectives in the arranged schedule. During this period, total of 6,551 new contruction sites declared Air Pollution Fee which amounted to 80,941,086 NT dollars. Among those sites, 114 sites only needed to delare documatations without paying Air Poillation Fee. Fuhtermore, there are 8,093 construction sites still under contruction, which could produce up to 8,923.16 tons TSP emission acrroding to our estimative calculation . Through this project’s management, the average reducing rate was 54.80 % that casuesed actual TSP emission to 4068.71 tons. In order to increase employers’ awareness on eviromental protection, this project proceeded with 9,121patrols, 5,147 sites were under this project’s observation list. The patrol members not only inspected on-site condition and reported to Bureau of Evironmental Protection (BEP) but also gave suggestion on air pollution control facility installation by the regulations. In addition, we promoted adopting street wash and sweep to construction site’s employers. 78 employers agreed to involve with this movement, and 27,642.88 kilometer (km) was executed as agreement requested. Rice is the major agriculture product of Tainan County, but the traditional open-air straw burning caused air pollution after haverst season. For this reason, this project assited EPB on promoting cocepet of non-open-air straw buring through varity way to general public. We also made agrrement on “Non-Open-Air Straw Burning Article” with contracted farmers and 7 rice manufactures of famers’ association. There were 617 contracted farmer partipated in this agrrement and total rice paddy reached 1,012.33 hectare. However, 676 sites occurred open-air straw buring during the period of this project, burning area were 118.32 hectare. Patrol members assisted to put out fire on 35.71 hectare, amounted to 199.23 tons, control rate was 29 %. Beside issue of open-air-buring, there were 17 uncover-suface sites improved under this project consulted. The mainly improving method was by implanting green covering plant or grass, the improving area arounded 34.62 hectare. Moreover, this project promoted EPB’s regulations by printing relative advertisment and holding conference or activity. During the period of this project, printed 5000 copy of construction site’s handbook, printed 500 posters on non-open-air burning and pray money reducing, and published 60,000 newspaper advertisment. On part of conference and workshop, we held 10 explanatory conference and 45 special-case explantory workshop.
Keyword
Open
top