To the central content area

Pollution Control Project for Construction engineering in Penghu County

Absrtact
Due to the established of Penghu County , accompanied with the conomic development and growth, it brings serious environmental problems, especially for the air pollution. Besides, it affects the life quality of the neighborhood and causes a lot of protestation.In order to solve these problems, Environmental Protection Bureau Of Penghu County initiated this project “Pollution Control Project for Construction engineering in Penghu County”. The purpose of this project is to find out the roots of the construction pollution and investigate on the public protest application. According to the findings from the investigation to restrain the air pollutants of construction, and to survey and monitor the emission sources of particles. Simultaneously, to improve the air quality and reduce the impact of the constructional engineering process to the surrounding dwellers, the proprietors of construction engineering are required to operate the air pollution control device properly. This project is proceeded in one year from June 8 of 2009 to February 28 of 2010. It focuson assisting the EPB to strengthen checking and inspecting all building sites, pipesand road works for improving the pollutions. We make lists to manage monitorial sites,and strengthen the knowledge for preventing pollutions of building sites by declareddocuments and forums. In the period of this project, it monitors 969 sites. The amounts of inspections are 2,087 times. Not only making lists by routine inspections but also holding 5 forums to announce the laws and regulations. It counsels 31 sites to clean around roads, they are cleaned for 10,770 Km in amount and tested by particles and oil to support (20 times of TSP test,and 12 times of dust left is monitored quarterly ,and 8 times of oil test). This major task of the project in early this year was listing construction activities. At the mean time, levying the Air Pollution Fee, inspection of construction activities, propagandizing policies, sampling and test of particular substances, and other relevant tasks were kept proceeding. Since the date of contract to 28th Feb. 2010, the achievements of the project in this year has been summarized into the table below:
Keyword
Construction engineering
Open
top