To the central content area

2010 Air Quality Maintenance Integrated Management Plan

Absrtact
This plan began on July 26th, 2010. Until May 31th, 2011, we had already finished the analysis of the environmental loading and the air quality data from 2005 to June 2011 in Yunlin County. According the data of Auto-monitoring station in Yunlin County, the number of days with PSI over 100 is 31 in 2009, and decreased to 16 in 2010. The number of days with PSI lower 50 is 166 in 2009.The number of days with PSI lower 50 is 231 in 2011. The main work of this plan are coordinating each specific plan and controlling each work content of plans, in order to catch the properties of pollution, it made the control goal from the air pollution protection books and send the books to let our air pollution plan book be examined pass by EPA. The statistics to 2010 year at the end of December, each control plan had been reached, and they had confidence to finish the uncompleted items before the end of year. Each specific plan’s cooperation is improved and also can be increased the material effectiveness by providing. This year we coordinate the EPB to promote the Energy Conservation and Carbon Reduction and Education propaganda, we completed 40 places of propaganda ending 31th May in 2011. We completed 60 places for the indoor air quality inspection until 31th May in 2011, most the data of the inspection were alike the suggestive value, and we take a propaganda at the same time of inspection.
Keyword
Air Pollution;PSI;Strategy of Air Pollution Control
Open
top