Stationary Source Control and Facility Operation Permission Examination Plan of Public & Private Places (factories)
Absrtact |
The current executive term of this program was from 2010/04/01 to 2011/03/31, during which every quantitative task has fulfilled the requirements of the contracts. The contents and results in details of the related operations are elaborated in the sections of this report.
1.Permit review practice
Till 2011/03/31, the County registered 351valid installation permits and 937 valid operation permits. During the program execution, a total of 306 processes were permitted after the monitoring and test on 213 fume channels and 56 perimeters. On-site monitoring found 10 fume channels and 1 perimeters with anomaly, largely because the sampled facilities have failed to be inspected as scheduled. In every of these cases, the monitoring and testing persons have noticed the on-site sampling persons from the inspecting institution to stop sampling and requested the factories to give written notice of re-inspection on a later date. Also, of 453 pre-issuance on-site inspections, 72.8% complied, with 123 processes non-complying with the contents of their applications, representing 27.2% noncompliance, which was lower than 39.1% of 2007 and 67.31% of 2008. This indicates that the firms have been increasing in quality under reinforced audit and control over the years to comply with the requirements of the Bureau of Environmental Protection.
2.Permit inspection practice and follow-up
A total of 453 processes were inspected in 324 cases with noncompliance found in 123 processes, representing 27.2% noncompliance. A total of 74 noncompliant processes were in this county except Changhua Coastal Industrial Park (22% noncompliance out of 338 inspections) and 49 noncompliant processes in this Park (43% noncompliance out of 115 inspections).
3.Management of regular inspection & report
Completed the monitoring and inspection on 62 fume channels. Nine cases were found noncompliant. Inspections with written notice in the noncompliance after thorough improvement were completed.
4.Inspection of stationary pollution source
(1) Completed the inspection on the regulatory compliance of 61 firms in this county that are in the speculated industrial category.
(2) Completed the test for heavy metals on 10 fume channels, all satisfying the standards for emission.
(3) Completed test for flue or perimeter on 20 fume channels or perimeters, of which
The value of steady abundant agronomy science and technology examination is 78, surpasses the laws and regulations standard at 50, and fined for NT$100,000. For glory fine enterprise Limited liability company, its sulfur oxide compound surpasses the emission standard and accuses legally.
(4) Completed the test and analysis on liquid fuel at 30 factories, of which new Wen the Qin hardware enterprise limited liability company clear shore factory including the sulfur share is 1.4%, surpasses the laws and regulations announcement standard at 0.5% and accuses legally
5.Collection of
|
---|---|
Keyword |
Stationary source、Emission、
|