Plan for dynamometer testing of diesel-fueled vehicle exausts and the consultation and assessment of exhasust improvement and maintenance garage

Absrtact
(1) 2,558 diesel-fueled vehicles arrived at test stations for full loading tests, achieving 127.9% of completion. (2) 1,719 vehicles were visually examined for exhausts, achieving 107% of completion. (3) 3,130 vehicles were removed from repeated counting after license plate identification, accounting for 104%. (4) Strict screening mechanism was enforced for roadside exhaust auditing, and 158 vehicles failed the tests, accounting for a progress of 105%. (5) 90 fuel samples were collected from vehicles arriving at test stations for testing, 100 from vehicles pulled over for roadside tests and 10 from gas stations, totaling 200 samples. Also, aromatic hydrocarbon test was performed on 6 samples. The progress of work was 120%. (6) The correlation test was performed, and the result showed that the correlation of Tainan exhaust test station is good with the stations at other counties/cities. (7) Quality assurance test was performed 15 times, and the measurements all fell within the upper and lower warning thresholds, indicating normal test ability and quality of test station. (8) The annual auditing of ISO 14001 was carried out and passed on Dec 31 2010. (9) TAF lab certification was approved for extension of 3 years. (10) 3 propaganda events were organized, 200 propaganda posters and 2,000 brochures produced. (11) 1 electric greeting card, electric graffiti, animation and animated game were produced and submitted to Environmental Protection Bureau, achieving 100% of completion. (12) 12 articles were produced and published on newspapers, achieving 100% of completion. (13) 216 runs of vehicle speed survey were carried out on 12 selected road sections, achieving 100% of completion. (14) 1 soil sample and 4 water samples were collected at the site of new station.
Keyword
Open
top