To the central content area

The pollution preventing of building engineering 2011

Absrtact
This project executed for 12 months from April 21, 2011 to April 20, 2012 and the major subjects included air pollution fee of construction, inspection and control operations of construction, self-managed site and city beautification operations promoting, caution managing operations, constructing control and counseling promoting, innovations for constructing control, form submitting and information analysis and etc. Regarding to the collecting of air pollution fee, it has completed 4,925 reported cases with 33 cases free from the fee and the total amount of collection was NT$ 68,556,085. All reported case were completed data filing with the rate of collection reached 69.7% and the rated of notification for 100%. The total completion was 3,380 cases with 3,313,513 square meter. There were 2,129 cases under construction with 4,362,087 square meter of completion. The notification through massage has 325 new consents agreeing to apply and it has sent 226 massages till now. For the inspection of subjective construction sites, the project has completed 14,650 times of inspections in response to the Implementation of Measures for the Administration of Construction Engineering Air Pollution Control Facilities (Hereafter referred to as the Measures for the Administration). It has inspected 90.8% of emissions with 72.92% of inspection rate and emission reducing rate reached 50.13%. For cases didn’t achieve the emission standard of the Measures for the Administration, it has been required to make improvement within limited time. Furthermore, it has reached the compliance rate of the first degree site management regulation for 91.4%, and 88.8% compliance rate of the second degree site management regulation. The total signature rate of site staffs reached 70.3% and it has completed 100 times inspection for the machinery oils using in the construction site which all complied with regulations and relative standards. For the promotion of self-managed site and city beautification operations, it has promoted 51 road adoptions surrounding the site with total length of 40,440 kilometer. In addition, just only 1 time has the slight flaw when it processed 50 times of checking operations at the areas. And others making improvements. The project has promoted and consulted to plant green fence in 10 construction sites within the County with total area reached 579.07 square meters, and 12,228.82 square meters of completion for ecological surface installations including green plant setting and biological setting of BDP and PVA. Also, it has promoted 50 sites for participation of posting anti-fouling mark. Regarding to caution managing operations, it has completed 40 stations of dust monitoring with the frequency of 10 stations in each quarter and all measured values showed improvements. There were 17 guidance instructions held during the project executing time with all-time average participants of 50 to 100 people which indeed achieved the effect of promotion and counseling. “Immediately improvements because there is no vocation in environmental protection” and “pollution-free road pipeline construction “are the two major innovations in this year. After executing the two innovations, it has promoted the pollution reducing rate from 47% to 52%, and increased compliable rate for relative regulations from82% to 90% which effectively improve all kinds of emulations in this project.
Keyword
Construct , air pollution control fees, control operations of construction
Open
top