To the central content area

環保署考核、臺中市空氣污染防制計畫書

Absrtact
We delivered 65 tasks ahead of the schedule specified in the contract. Completed the billing for Term 1 on July 25, accounting for 46.6% of the workload, which satisfied the provision of the contract at 35%; completed the billing for Term 2 on Nov. 25, accounting for 90.5% of the workload, which satisfied the provision of the contract at 90%; completed the final task of this project, “holding of meeting on January tasks”, on Jan. 22, 2013. Submitted the draft of the Final report and the 2013 January Report on Jan. 25, with which we completed the project’s workload fully. We are summarizing two main results in this year as follows. (A) Review of 2011 EPA evaluation results The 2011 EPA evaluation results were announced on April 19, 2012; Taichung City received Excellent grading as special municipality in overall evaluation, and a sectional excellence in the category of air quality management planning. 1Good quality of reasonably completeness in checking of database for stationary pollution sources; 100% achievement of inspection in report on emission by stationary sources; Good attitude for cooperation on on-site checking of air pollution fees, with serious execution of checking and active involvement; active checking on the municipal Wen-Shan Incinerator for CEMS and reporting on errors, which is recognized; ranking the top in the nation for tests taken at the station of dynamometer test; being number one in the nation for elimination of old diesel vehicles; we advise to keep going. Made happen zonal control of construction sites, with aerial photography and web-cam monitoring exercised. Persons on case and mobile inspectors from commissioned firms were well familiarized with construction sites and stationary pollution sources, and able to identify flaws or counsel in improvement quickly. Carried out to the full the “Regulations on the management of air pollution controlling facility in construction works”, with a high rate of prompt disposal on those failing to improve as specified. (B) Composition of Taichung City air pollution control plan Ver. 2013 Of the tasks of 2012 Project, the primary one was to assist EPA in planning on the 2013 version of Taichung City air pollution control plan. While the contents include 12 chapters and two appendices, we also assisted in holding hearings, inter-agency coordination meetings and replying to EPA review comments. After two rounds of comment revision, EPA approved it for reporting (referenced by Huan-shu-kong-zi-1020000382) on Jan. 2, 2013. As this air pollution control plan in writing has detailed and complete contents, which EPA recognizes, the Taichung City Government was invited to share its experiences at the national result review meeting held by EPA for 2012.
Keyword
Open
top