To the central content area

2012 Electric Vehicles Promotion Project in Taichung City

Absrtact
1. Collect foreign electric vehicles, charging mode and promotion of clean vehicle current situation the status and characteristics. The related unit impels the policy and reference to the promotion of urban experience. This project proposed an “electric vehicles to promote strategic planning in Taichung City”. 2. Completed the " evaluation and planning proposals Report of connection type public bicycle rental system in Taichung city ". include collecting other cities U-BIKE, C-BIKE and the Netherlands, Paris practices. Analysis of Taichung City public transport, the surrounding commercial, commuter, travel, bus connection points with the urban bus, TRA such, planning the establishment of credit system evaluation public for bicycle rental system. 3. This project has finished 120 cases of initial audit for re-equipping gasoline vehicles into vehicles with LPG and gasoline dual fuel systems. In which, there were 78 cases passed audit and got NT $8,000 coupons for Gas. The total subsidy amount was NT$ 624,000. 4. This project completed 6,651 cases of initial audit for 2-stroke old scooter scrapped. In which, there were 6,335 cases passed audit and got NT$ 1,500 subsidy amount. The total subsidy amount was NT$ 9,502,500. Also, this project offered 6,000 public transportation payment cards and post to people. Furthermore, this project completed 742 cases of audit for elimination old vehicle to buy less pollution vehicle which total subsidy amount were NT$3,890,500. 5. Conducts replace older 2-stroke old scooter scrapped and promote the use of cleaner vehicles advocacy work. Content replace older 2-stroke old scooter scrapped and promote the use of cleaner vehicles of Subsidies. Encourage people out of the home of 2-stroke old scooter scrapped. this project held 50 seminars. 6. Update web page of the Taichung green energy transportation in weekly. Include charging station and updated with the latest low-pollution vehicles and electric vehicles subsidy data. 7. Inspection of motor vehicle charging stations in seasonal. Had 3 times inspection. Statistical use of electric vehicles and maintained to ensure charging function the normal use. 8. Inspection of electric Vehicles charging stations in seasonal. Had 4 times inspection. Record electricity, inspection time and charging station with regulatory information. Statistical use of electric vehicles and maintained to ensure charging function the normal use. 9. Completed 97 electric Vehicles charging stations to inspect the site operations. Of which 85 have been completed, still missing 12 electric Vehicles charging stations can’t be set. Been set for electric vehicle charging stations, insurance theft insurance and third party liability claims, totaling 149, final acceptance into the insurance period to Apr.-30, 2013. 10. In Jan.-10,2013 to complete a total of 25 electric vehicle charging station parking Sites wheel gear. 11. There were 4 radio advertising articles and 21 anchorperson articles, which were broadcasted via HITFM FM 89.1, Bestradio FM 90.3 and SuperFM 99.1. 12. Complete the rental of 16 small lightweight lithium battery motors. 13. 50 electric bikes comply with vehicle specifications each spare battery two groups, a total of 100 sets of batteries. 14. Complete electric vehicle charging stations operational planning assessment report. Includes charging station background operations management, cost analysis, software and hardware expansion plan, charging mechanisms, operational planning. 15. handling electric vehicle trial experience and marketing commentary activities. this project held 50 seminars and there were 3,092 people participated. In Jun.-13,2012 conduct a screening enterprises leasing electric town car enabled press conference.
Keyword
Electric Vehicles;electric Vehicles charging station
Open
top