To the central content area

The project achievement report of Environmental Protection Bureau, Yunlin County

Absrtact
This was a one-year term project, which started in March 1, 2012 and ended in February 28, 2013. The primary objects are to give assistance with tighten up construction management business, including inspect and control of building sites, lay pipes and cables, and create governed construction sites information files for the EPB. By the methods, included publicity material, construction pollution conferences, construction site assistance, and educating the knowledge of pollution prevention to achieve the purpose of reduction pollution. To make every effort to raise performance results of air pollution prevention operation of the EPB and improve performance evaluation results from the EPA. The efforts are as follows. The rate of construction emission volume is 61%, and the volume of TSP is 5,828.67 tons. The rate of the emission inspection and governed inspection are 97% and 76%. The correct rate of spot-check for emissions is 100%, and the quality rate of database archiving is 100%. Construction site denounced sanctions are 108 cases, and improvement rate is 100%. The self-assessment results is 2.45 points, and achievement rate is 98%; the evaluation results is the best over the years. The declarations of air pollution fee for construction are 3,844 cases and air pollution fees amounted to 47,441,056 N.T. dollars; the number of air pollution fees declarations of this year is highest in three years. 4,804 construction sites were governed by the EPB in 2012, and the governed inspection rate is 76%. Compared to last year, the air pollution fee declarations increased 445 cases, governed construction sites added 310 places, and the rate of governed inspection decreased 11% in this year. Further, add one inspection team and inspection times; construction sites which were multi-disassembled will be attached multi serial numbers in order to improve under-governed rate. The project implementation results are as follows. Governed construction sites are 4,804 places and the amount of inspection for building sites are 6,243 times; sites information collected during routine inspection was created files on schedule; 10 construction site pollution consultations were held. Constructors (46 sites) were encouraged to join the adopt-a-road program. The street cleaning operation was completed 60,166.7 kilometers, and TSP volume was reduced 830.3 tons. The innovative approach of this year is resource recycling and reuse which the construction materials and exposed area covered with waste advertising canvases in under construction area. This method gets good response, covered area is about to 1,000 m2, and pollution reduction rate is 58%. Attempting to tie in "2013 Yunlin County Agricultural Fair" with Yunlin County government hold the conferences of green fences in specially designed exposition areas which to discuss how to beautify environment with green plants around main exhibition hall and secondary one. A construction site had completed simple green fences which length is 150 meters now.
Keyword
Construction;Fugitive Particulate Source;Control Strategies
Open
top