The 2013 Project of VOC inspection in offshore industrial zones, Yunlin County

Absrtact
The main work of the project plan for the project and tube industrial area of the county Islands volatile organic pollution control business. Indeed supervision Islands Industrial Zone volatile organic sources of pollution, and volatile organic pollution checking, testing operations and follow-up control operations, to achieve pollution reduction goals. So far the implementation of this project , work items are following the original method of planning and execution of the operation , the main results are as follows : 1. An improvement in the combustion exhaust emissions norm tower : a total of 44 islands industrial gas flaring tower , has completed 24 improvements , a total of 102 completed seven improvements were units of ARO-1 Plant No. AE01 burning towers, and Taiwan ARO-2 plant number AP01, ARO-3 plant number AE01 and light oil plant AR01 ~ AR04, the remaining 20 will be 103 years before the end of June . 2. fixed roof storage tank regulatory compliance audit of 312 degrees , regulatory compliance conditions are 168 , of which 17.85% ( 30 ) control equipment not yet comply with regulatory requirements , 25% ( 42 ) record with tank claims data are missing , 0.59% ( 1 ) found that the slot is not clear reporting and record checks . 3. loading operation facilities of checking 139 for permit applications and the EIA reported total vapor pressure of the different loading operation facilities , investigate the actual situation of the factory has been requested , and check application data , for licensing transactions. 4. Equipment components inspectors to detect a plasticized wheat plant ( light oil plant ) for the maximum number of leaks , leaks proportion accounted last year for the 21:00 and 9:00 this year , second only to the latter sets of Haifeng factory (ARO3 plant ) , last year 6:00 and 8:00 this year , so please fix two plants more positive self- detection equipment components and increase the frequency of sampling tests planned equipment components from 99 to 102 years with an average leak rate 0.18% 99 to 102 years of independent factories average leak detection rate of 0.32% , comparing the two sampling tests found the leak rate of less than factory independent testing. 5. Wastewater field in addition to checking the current situation in Changchun stamped artificial plants and acetic acid plant in Taiwan completed stamped connectivity to external control equipment at the end of this year , the plants are handled extension , extension of the light oil plant has not yet submitted a letter of exhibition is expected to be extended 103/09/30 , been extended to the rest of the plant are 103/10/31
Keyword
Fixed roof tanks, floating roof tanks, Flar, equipment components, cooling towers, loading operation facilities
Open
top