To the central content area

Taichung City Air Pollution Control Construction Engineering Construction Engineering cum air pollution fee charging management plan in 2013

Absrtact
1.Apply for air pollution control fee for construction projects started and completed settlement of cases reported a total of 11,426 pieces (6,132 pieces start reporting, the completion of the settlement 5,294 pieces), and the other city construction projects total air pollution control fee amounting to 183,473,918 yuan, Internet reporting construction reporting air pollution fee rate 48.55%. 2.Regional development has handled two games shooting aerial remote control aircraft and counseling 10 major construction projects carried laying straw and vegetation pollution control, with a total area of 701,472 square meters laid month about 16.62 tons of TSP can be reduced particulate emissions. Another management approach in line with the average degree of 90.65%, with an average reduction rate of 62.04 percent, 76.15 percent sewer rate 3.Evidence collection operations, dust pollution 129 times, 21 times management approach, road pollution 129 times a second and open burning; punishment denounced by the ruling center totaling 189 times, 189 times the pollution to improve, improve the rate of about 100% . 4.Advocacy operational aspects of construction projects, organizing seminars seven counseling sessions, including construction engineering Pollution, noise pollution control, xanthan gum bare ground control; another handle network activity a quiz sessions, March has completed the planning Web design and completed in July, September and notify winners to complete the activity. 5.Statistics 102 years on February 1 to December 31 102 years EEMS EPA environmental control system inspection disposition of cases a petition, representing a seven-year decrease, indicating the site control to a certain extent.
Keyword
PM10、TSP
Open
top