To the central content area

Achievement and Integrated for Local EPBs Air Pollution Against Strategies

Absrtact
The scope of this project was to assemble, to evaluate, and to assess the effectiveness of the Environmental Protection Bureaus (EPBs) in conducting air pollution control work. In addition, this project proposed control strategies for local SIP projects to improve the utilization of their air pollution fee. After review, the between-project time for conducting common projects was less than 3 months for most counties and cities, which showed positively in improving efficiency and project continuation. In order to analysis pollution control effectiveness, this project evaluated areas including the Stationary Pollution Source Installation and Operating Permit system, the stricter standards for electric power industry and the steel industry, the inspection/maintenance program for diesel trucks and motorcycles, the open burning control, the control of fugitive dust from riverbank, the construction dust controls, and the management of the air quality purification area. The number of petition cases in 2013 increased by 7041 compared with The number in 2012. 3,534 copies of “Questionnaire for the Satisfaction Degree of Air Quality Improvement” were surveyed. The ratio of satisfaction reduced from 61.4% in year 2012 to 60.9% in year 2013. Conferences were held for comments exchange between local EPBs and EPA, and to receive recommendations from the air pollution control technology committees. In term of the Auditing Rules for the Effectiveness of Local EPBs, the six audit items in 2012 have been revised into four audit items in 2013. The objective is to strengthen the EPB’s air pollution control performance through combining and simplifying the audit indicators. The new emphasis in auditing the local air quality management plans will require the implementation and planning PM2.5 control strategies and emissions management to be included in the content. This year we have upgraded the “SIP Audit Information System” with the ASP.NET program language and planned the revision steps and its protocol to facilitate for the addition and expansion. In addition, we added new content and functions to the system in order to improve its effectiveness for the uses.
Keyword
inspect、audit、index
Open
top