To the central content area

Project of construction pollution control and inspection

Absrtact
This was which started in March 21, 2014 and ended in February 28, 2015. The primary objects are to give assistance with tighten up construction management business, including inspect and control of building sites, lay pipes and cables, and create governed construction sites information files for the EPB. By the methods, included publicity material, construction pollution conferences, construction site assistance, and educating the knowledge of pollution prevention to achieve the purpose of reduction pollution. To make every effort to raise performance results of air pollution prevention operation of the EPB and improve performance evaluation results from the EPA. The efforts are as follows. The rate of construction emission volume is 60.3%, and the volume of TSP is 4,177 tons. The rate of the emission inspection and governed inspection are 96.8% and 77.9%. The correct rate of spot-check for emissions is 100%, and the quality rate of database archiving is 100%. Construction site denounced sanctions are 55 cases, and improvement rate is 100%. The self-assessment results is 1.94 points, and achievement rate is 97%. The declarations of air pollution fee for construction are 4,267 cases and air pollution fees amounted to 68,054,784 N.T. dollars; the number of air pollution fees declarations of this year is highest in three years. The project implementation results are as follows. Governed construction sites are 5,755 places and the amount of inspection for building sites are 7,527 times; sites information collected during routine inspection was created files on schedule;5 construction site pollution consultations were held. Constructors (44 sites) were encouraged to join the adopt-a-road program. The street cleaning operation was completed 44,023.36 kilometers, and TSP volume was reduced 607.52 tons.
Keyword
Construction, Fugitive Particulate Source, Control Strategies
Open
top