To the central content area

2014 Tainan City’s Construction sites Management and Inspection Project

Absrtact
“2014 Tainan City’s Construction sites Management and Inspection Project” (the project) , which executed from January to December, 2014(the period), is a continuing project carried out the past years’ rountin on inspecting the construction sites and promoting latest relvent regulations. During the period, there were 7,755 new construction sites decleard the Air Pollution Control Fees, collected total amout of NT$ 133,016,615 . One of major target in the project is reducing the TSP emission by inspecting sites’ air pollution control facilities. The estimated TSP emission of 10,334 sites that under contstution was 12,912.30 tons. Through the project’s managment, 7,754 construction sites were inspected, the control rate was 75.03%. The actual TSP emission downed to 5,158.97 tons, and thus the average reducing rate was 60.05%. Rice is the major agriculture product of Tainan city, but the traditional open-burning caused air pollution after harvest season. For this reason, the project made “Non-Open-Burning Article” agreement with 245 contracted farmers among 4 rice manufacturing associations, total rice paddy reached 984 hectares. However, there were still 442 sites occurred open-buring mainly during 3pm-6pm, burning area were 46.99 hectares. The project’s members assisted to put out fire on 67.67 hectares, the control rate was 59.02%. Moreover, the project conducted the Barren Land Investigation & Consulting Improvement, which discoverd 76 barren lands, total of 56.06 hectare, including 40.71 hectare of normal barren land and 15.35 hectate of river barren lands. On the other sector of Consuling Improvement, there are 43 uncover-suface sites improved under the project consulted, the improving area are 42.35 hectare, including 27.17 hectare of normal barren land and 15.18 hectate of river barren lands. In oreder to promote the importance of air polloution control with latest government regulation. The project held 2 explanatory conferences for general construction sites, 2 “Non-Open-Burning” explanation session, 5 explanatory session to those sites which were heavy polluated or listed under major construction sites , and published 6 news.
Keyword
Tainan City’s Construction sites Management and Inspection Project
Open
top