Abstract The main work items of Stationary air pollution source control project are as follows: (1) Database establishment, maintenance and updates. (2) Stationary Sources Permits application documents examining and issuing, including permit inspection. (3) Annual emissions quantities check for the premises which have been announced in 2 batches. (4) Using standard air pollutant testing method to inspect plumes of stationary sources. (5) Reinforcing control of fugitive particulate emissions. (6) Holding meetings for related policies or law announcement. (7) Reinforcing control of dioxin. (8) Reinforcing control of the premises odor complaints regarding stationary sources from citizens. (9) Audit of Continuous Emission Monitoring Systems. (10) Other work items. This project, started from 4th February 2015 till 3rd February 2016, was empowered by a contract which issued by the Bureau of Environmental Protection, Tainan County. We completed all work items before deadline. In order to make sure that the quality and quantity both met the requirements of the contract, we attended the monthly meeting of the Bureau, and followed internal QAQC plan. Schedule and quality of every work items also had been reviewed by the State Implement Plan, in order to ensure all requirements were met. Summaries of work items are as follows: 1. Database establishment, maintenance and updates The goal of this work item is to maintain and update the emission inventory of 725 plants and to add new emission inventory of 30 plants in database. We maintained and updated the emission inventory of 738 plants and added new emission inventory of 33 plants in database. By the end of the project, annual emission quantities of different pollutants from stationary sources in Tainan City are as follows: 2,678 tons of particles, 3,445.7 tons of SOx, 4,720.8 tons of NOx and 3,011.1 tons of VOCs. 2. Stationary Sources Permits application documents examining and issuing, including permit inspection. 373 permits were issued, including 49 installation permits, 15 modified permits, 49 operation permits, 133 change permits, 70 renewed permits, 49 re-issued permits and 8 coal-fired permits. The average review duration of the application documents was 14.8 days. 211 cases of air pollution qualified persons replacement were proposed and approved. For 15 significant cases of permit application, experts review was introduced to validate the content of the documents. Periodic inspection for operation permits has been performed for 734 operation permits. Among them, 79 operation permits didn’t meet the contents of permits, and the discrepancy of inspection was 10.76%. Furthermore, the plants were asked to modify and improve the inconformity. 79 plants proposed their modification or changes. 3. Annual emissions quantities check for the premises which have been announced in 2 batches. 376 premises are required to report emission inventory seasonally by regulation in Tainan City. (96 of them are announced in first batch, and 280 of them are 2nd batch.) The reporting rate, for a total of 1454 reports, is 100% from 4th quarter, 2014 till 3st quarter, 2016. We also checked all reports and found that 1406 of them (96.7%) were correct, 48 of them (3.3%) were asked to improve within a limited time. On-site inspection for the reports was conducted on 312 premises; 89.4% of them proved correct (279 premises), 10.6% of premises, which was asked to improve within a limited time, showed discrepancy. We found that on-site records of raw materials didn’t match the reports were the main reasons, a total of 15 premises (42.86%), of inconformity. 36 premises report their emission inventory of Green House Gas (GHG) seasonally. (21 of them are announced in first batch, 11 of them are 2nd batch and 4 of them are volunteer to report their emission inventory of GHG.) The reporting rate, for a total of 144 reports, is 100% from 4th quarter, 2014 till 3st quarter, 2016. We reviewed all reports and found them correct. 4. Using standard air pollutant testing method to inspect plumes of stationary sources. We performed 18 plumes for SOx, NOx and particulate testing, 8 plumes for dioxin testing, 5 plumes for heavy metal(Pd, Cd, Hg and As) testing, and total suspended particulate testing in ambient air on boundary of 12 public or private premises. We also took 30 fuel samples from different plants to check if the sulfur content in the sample met the standard. Testing results of the total suspended particulate in ambient air on boundary of 4 public or private premises were not in compliance with standards, others testing results were in compliance with standards. 臺南市政府環境保護局「104年度臺南市固定污染源許可審查及巡查管制計畫」期末報告 ix 5. Control of Fugitive Dust Air Pollution from Stationary Pollution Sources. This work item is to inspect the premises which have been specified by Management Regulations of Air Pollution Control Facilities for Fugitive Particulate Emissions of Stationary Source and to help them improving the discrepancy. 214 patrols were paid and 195 of them met the regulation, the compliance rate of the regulation was 91%. 6. Holding assemblies. 4 assemblies were held during this period. Besides, for on-job training, three sessions were completed. 7. Control of Dioxin emissions On-site inspection works had been performed on 52 plants with 69 stacks and 2 of them were under Dioxin monitoring span supervision. The results demonstrated all of them could meet the requirement and emission standard. 8. Odor complains from citizens Periodical check for the frequent odor complains factories list of stationary sources. 9. Other work items (1)10 articles regarding environmental protection were posted in newspapers. (2)To cooperate with polices and attorneys for comprehensive inspection for 4 times and checking the gravel trucks for cover net pulling compliance policy for 8 times. (3)To help determining if plumes meet the 8D/2D requirements when applying permits as well as if they should apply for permits. (4)To submit and summarize the work results as the Environmental Protection Administration (Taiwan) and the State Implement Plan required
Keyword
database, staionary resource, air pollution, permitting system, fugitive particulate matter, Odor petition
Open
top