To the central content area

The air pollution control program of construction in New Taipei City in 2015

Absrtact
2015 New Taipei City Construction Project Air Pollution Prevention Program, perform total of 12 months and 20 implementing human, work projects are completed on schedule. The results are classified into eight parts, including data collection and strategy formulation, air pollution control fee collection and management, online reporting system is management and promoted, onsite inspection, cloud self-management system of construction engineering management, construction machinery noise control, policy promotion and QA/QC. Data collection and strategy formulation is project also promotes main channel systems of pollution reporting, and invites the top ten development companies of the city, subcontractors and the builders for participation. The environment evaluation of the ongoing projects in the city was investigated, after guidance and negotiation, the reduction rate of most projects reached over 50%. At noise control measures, conduct propaganda both the perimeter of noise reduction measures and reduce noise. The heavily polluted areas, such as Bali, Xinzhuang, Xindian, and Tucheng, due to constructions, are categorized as special zones for pollution control. For the areas with low pollution reduction rate, the enforcement of the pollution prevention facilities on the construction site, in order to increase the total reduction rate. The air pollution control fee collection and management is based on the concept of pay by user. During the implementation period, a total of 3,688 construction projects paid the air pollution control fees. The average payment rate of monthly air control fees is more than 80%. The public services provided include SMS for notification, suggestion box and pollution control fee pamphlets. Onsite inspection has construction project has expanded inspections verifying the electronic operating system functions and new inspection dispatch mechanism system. Onsite inspection has been conducted 14,699 times, achieving 81.7% of the total control rate. To achieve pollution reduction of the sensitive areas, 30 construction projects in the eight controlled areas are listed for control. And with high pollution project monitoring, pipeline construction projects is the airborne dust required to prevented, and the site needs to be cleaned after construction, rotation tutoring missing project, promote street maintenance and dust reduction and other control strategy. In this year, the cloud self-management system of construction engineering is implemented, expansion check project, upload photos number, establish alert and build admin module. During implementation of the program, 830 construction sites have signed the agreement to participate. Regarding the cloud self-management system of construction engineering demonstrate recognition. The construction machinery main purpose is remedial construction engineering machinery noise reduction measures, proposed four noise counseling to improve the effectiveness case, and construction machinery field operating volume measurement. Regarding the noise prevention consultative meeting. Currently in addition to measuring, for noise control laws in the process of inspections and propaganda to industry, avoid noise interference. In terms of policy promotion, 4 meetings concerning pollution reduction and 4 promotional seminars on the regulation with different themes and objectives were held. These meetings described key points of the air pollution control in construction, and introduced various projects by environmental protection bureaus. The promotional materials include printing and issue of brochures. Moreover, the construction pollution control website is established for convenient access at any time, allowing the public to obtain the correct knowledge quickly. In order to investigate the public’s awareness of the operation of the air pollution fee reporting system, and provide relevant suggestions or projects to be improved, this project conducted a questionnaire survey and retrieved 505 valid samples.
Keyword
Air Quality, Construction, Pollution Reduction
Open
top