To the central content area

The Integration Plan of Air Quality to Manintain, Improve, scheme and street dust

Absrtact
The main work items of this project include executing air quality analysis, proposing air pollution control strategies, supervising and evaluating projects subsidized by Air Pollution Control Fund, managing Air Pollution Control Fund, promoting spirit money reduction during the Chinese Ghost Festival, and evaluating maintenance works in air quality purification area. The important results of this project can be summarized as follows: 1. Air quality analysis The variation of concentration of air pollutants shows air pollutants are decreasing in New Taipei City. The variation of NO2, CO and SO2 are not significant, in which NO2 and CO are mainly from automotive vehicle emissions, and SO2 is produce by fuel combustion. More efforts should be put in, such as enhancing public transport, reducing vehicle fuel use and promoting clean vehicles. The stationary source control practices also need to be adjusted. 2. Monitoring data analysis and control The 2012 to 2014 measurement results from the Lin-kou air quality monitoring station were analyzed. The high concentration events of PM2.5 occurred more often in the nighttime. It was affected by abnormal operation of coal-fired boilers. After inspection by EPB, Guei-kang company was shutdown, and another company Sheng-juen was required to pause operation to improve its manufacturing process. During May to December 2015, the amount of highest 10% of hour concentrations of PM2.5 brought by East-northeast/east winds was lower comparing with those of 2012 to 2014. Compared with the same period of 2014, the nighttime average PM2.5 concentration measured during May to Dec. of 2015 decreased about 7μg /m3. Considering a complete year, the nighttime average PM2.5 concentration decreased 5.5μg /m3 from 2013 to 2014. It suggests that shutting down Guei-kang and Sheng-juen indeed improved the nighttime air quality at Lin-kou air quality monitoring station. The results of Shin-juang station show the effects by high concentration from the south.In order to improve Shin-juang air quality, audit for south area is proposed. We also apply for EPA AirBox, which will be used for real-time inspection, to find out the pollution sources and improve the air quality. 3. Supervision and Evaluation projects subsidized by Air Pollution Control Fund Performances of most projects were good. The stationary sources project and the diesel car project had lower score. It’s because of the executing company of stationary sources project has been replaced, which resulted in running behind schedule. The diesel car project scored low because it didn’t reach the target of annual air pollution control plan. 4. Air pollution control strategies According to Environmental Protection Administration’s target of decreasing PM2.5 concentration in 2020, the New Taipei City Integration Plan has set control approach and the control target in 2015 prevention plan. The short-term reduction goal from 2015 to 2017 will be achieved mainly by stationary pollution sources control, such as unit rebuild of the Lin-kou power plant, to raise the control rate of pollution sources, to decrease the dust raised on motorways, and to control the emission from construction sites. Long-term reduction goal (in 2020) will be made by lowering the mobile source emission. However, the reduction amount addressed in the annual air pollution control plan is difficult to accomplish by present control regulations. 5. Evaluation of maintenance work in the Air quality purification area In this project, the audit and evaluation task was implemented seasonally (4 seasons) this year. The check items include vegetation maintenance, environment clearance, and utilization status. Trash and defoliation was found in only Huan-he North Road at Sanchong, Heng-ke-ya road at Lin-kou and Qing-Tan Elementary School greening project. The vegetation maintenance needs to be enhanced in the Da-kan environmental park at Bali. In the Ting-Hsin park at Tucheng, some space was occupied by cars and motorcycles; and the guardrail was also damaged. Those districts were requested to improve the execution. 6. Promotion of spirit money reduction during the Chinese Ghost Festival Various outreach activities were completed in this project, including brochure publication, website update, holding the press conference, and assistance of the Pudu (universal salvation) ceremony of Chinese Ghost Festival. There were almost 12,000 people joined the online Pudu activity. To promote of spirit money reduction, EPB cooperated with Carrefour. Limited (650) set of environment-friendly spirit money were sold at 12 Carrefour retail stores in New Taipei City.
Keyword
air quality, management and evaluation, air quality cleanzones
Open
top