The overall progress of the project is 98.9% (due to the current situation of emergency response funds and the rehabilitation of the well facilities based on the actual situation of the implementation of the main implementation rate can not be 100%, the remaining routine work items have been completed Up to 100%) of the completion of the progress of the work of the project, summarized as follows:
First, groundwater well monitoring
(A) Hsinchu Science Park pollution warning system groundwater quality monitoring total monitoring 13 (abundance of water) test results of heavy metals and volatile organic compounds are in line with regulatory standards.
(2) Investigation and monitoring of groundwater pollution in Xiangshan industrial area
1. Pollution survey: carbon stable isotope analysis results and environmental conditions can be initially determined, W9912 and F010 monitoring wells of trichlorethylene derived from the same source of pollution, as W103-01 and the previous two pollution related to the need for more information to be Confirmed. At present, the implementation of the project has been implemented in the Dongguang section. The EPB has been subsidized by the EPD to subsidize the Xiangshan District Pollution Investigation Project. Subsequent projects can be investigated and grasped by the project.
2. F010 dry season when the trichlorethylene has been below the regulatory standards, but the water period exceeds the control standard, W104-1 over the years detection of vinylidene chloride are more than the control standards, this year's dry water period are reduced to below the regulatory standards , W103-1 Trichlorethylene over the years exceeded the control standards, although the downward trend in dry season, still more than the regulatory standards, W9912 over the years when the test standards exceeded the ups and downs, this year's dry season has been lower than the control standards, standard.
3. Minjing detection of 10, did not exceed the regulatory standards.
(3) The MTBE and total petroleum hydrocarbons in the three wells of the oil reservoir of Hsinchu Oilfield and the ground monitoring wells are not exceeding the groundwater control standard.
(4) MTBE and chloroform of 1 field monitoring wells around Tsinghua University South Campus (formerly Hsinchu Education University) did not exceed the groundwater control standard.
Second, the tube pollution site supervision and verification and verification
(A) of the pipe site management supervision operations: every 2 months 1 inspection and supervision operations, completed a total of six inspections and supervision operations.
(2) Chaiqiao oil sub-site: 105-12 November 105 to improve the soil pollution verification, the verification results in line with the control standard, will be related to follow-up follow-up procedures.
(C) fishing station site verification: December 12 for soil and groundwater sampling verification operations, the verification results in line with regulatory standards, will be carried out follow-up follow-up procedures.
Three wells were completed (108 wells), and the wells were updated for 8 times. There were 4 wells in the wellbore facility, and the wells were evaluated in a total of 20 times, Mouth and waste wells 1 times.
Fourth, underground storage tank control operations
(1) 21 gas stations to detect leak detection test results for the bridge gas station, Hsinchu gas stations, the National Park gas stations and Jialong gas stations and other four gas stations to detect PID / FID abnormal measurement of the leak Gas GC analysis and interpretation of the interpretation of Hsinchu gas station, the National Park gas station and Jialong gas station analysis results Although the spectrum of unknown peaks, but are not detected BTEX, MTBE and n-decane, to determine the risk of serious pollution should be. Bridge station to detect BTEX and MTBE, after consultation, the station side of the soil sampling.
5, soil and groundwater pollution incident strain survey
(A) four-dimensional gas station soil pollution site verification operation: in June 28, 2005 to complete the verification operation, the test results 2 points beyond the control standards, follow-up should be declared as pollution control sites.
(2) Hsinchu oil depot parking lot monitoring groundwater detection was completed on April 29, 105 sampling operation, the test results are lower than the control standards.
(3) Hsinchu oil depot around the completion of the three wells to complete the oil wells around the wells investigation and sampling of three times, the test results of methyl tertiary butyl ether measured no more than monitoring standards.
(D) Jialong gas station on October 30, 105 to complete the leak test tube sampling operation, the soil gas GC analysis results for methane gas anomalies.
(5) Hongzhi Enterprise Society Soil Verification November 14, 105 Test Results Soil heavy metals did not exceed the monitoring standards.
(6) Air Force Base Farmland (Ancient Section Section 332) Test Results Soil heavy metals have no more than monitoring standards.
(7) Xiangshan gas station WA03 (O00200) monitoring wells in November 30, 2005 test results groundwater benzene measured value of 0.198mg / L, exceeding the control standards.
(8) Soil and groundwater verification at Hsinchu District fishing station soil and groundwater validation Soil and groundwater verification operation on December 12, in order to ensure the improvement of pollution improvement, the depth of soil sampling and the number of groundwater detection ports were increased. Groundwater detection 2 times.
Sixth, pollution prevention and control related activities
(A) to complete 11 times the campus soil water environment education, to respond enthusiastically, the school feedback hope to continue for the campus tour.
(B) to complete a high pollution potential site site pollution type and case description of the regulations and regulations briefing.
(3) 450 copies of the promulgation and production of aquatic products shall be completed in the current year.
Seven, the project results show
In November 10 to 11 November to participate in the Kaohsiung City Soil and Water Environment Exhibition and International Symposium, and display Hsinchu City, the creation of soil water teaching aids 3D soil water to the heart of large adventure works by the Hsinchu City national treasures painter Wei Rongxin teacher and New Culture Association Deputy Chief Executive Chen Minyu (corn Chen) teachers work together to create, through the 3D painting so that people can see from the ground down the feeling of pollutants, feel the seriousness of underground pollution, to convey the soil conservation propaganda effect.
In addition to the exhibitions of 3D works, we have set up a "interactive area of soil and water pollution prevention and display", and set up a " Local water survey to prevent where? "And other small game area, with the small water droplets in the small three-dimensional magic box game area 3 soil environment education show interactive SAR, so that people can at the risk of entertainment, to understand the importance of soil conservation The