2016 Construction Engineering And Fixed Pollution Source Inspections And Contingency Plan For Environmental Pollution Petition Cases

Absrtact
The project period is from February 1st, 2016 to December 31st, 2016, and the main work includes: inspection of compliance with construction engineering regulations, verification of road adoption results of construction engineering alternatives, inspection of regulation compliance of stationary pollution sources and stationary emission sources, inspection of agricultural waste open burning, audit of assistance to people’s petition cases, audit and inspection of environmental pollution cases, Evidence collection via technological method and inspection of construction engineering surrounding TSP and construction machinery oil sulfur content. All the project items have been handled according to the progress schedule, and the current progress has reached100%, which is in line with the predetermined schedule. On the inspection of compliance with construction engineering regulations, the top 100 pollution emission sites and EIA development sites are the key objects for inspection. Currently a total of 7,635 inspections have been conducted, including 897 holiday inspections. On construction engineering alternatives, currently there are a total of 141 road sections adopted by 59 sites, and the adoption results are checked every month by the project. Totally 493 inspections of regulation compliance of stationary pollution sources were conducted, and totally 325 inspections of regulation compliance of stationary emission sources were conducted. Totally 247 biomass open burning events have been captured. Totally 12,074 audits of assistance to people’s petition cases were completed. On the inspection and investigation of environmental pollution cases, the 43 cases referred from the Environmental Protection Bureau have been accepted and dealt with. FID,FLIR,UAV and FTIR have been used on the program of evidence collection via technological method.20 construction engineering surrounding TSP inspections on 10 sites have been performed, and 50 sampling tests of construction machinery oil sulfur content have been conducted, and all the results met the requirements.
Keyword
construct, stationary pollution sources, people’s petition cases
Open
top