To the central content area

Hazardous substance monitoring and pollution investigation plan in Pingtung County industrial area

Absrtact
program is scheduled for work from April 15, 105 to April 14, The results of the implementation at this stage are as follows: First, public and private places inventory data collection analysis Pingnan industrial area tube factory 44 (currently closed 5) and 32 unregistered factories (currently shut down 1); Pingtung industrial area tube factory 36 and no tube factory 108 (currently plant 15 in the industrial area and 22 out of the factory (currently suspended 4); Pingtung processing export area by the tube factory a total of 22 11, a total of 23 unregistered factories; Pingtung Agricultural Science and Technology Park by a total of 13 factories, a total of 34 factories without a tube. Second, the industrial zone risk potential assessment operations Pingnan Industrial Zone uses 87 high-risk species of the plant a total of eight factories, 18 processes, which use 11 high-risk species; Pingtung industrial area using 87 high-risk species of the plant a total of plants, a process, The use of high-risk species 1; Neipu industrial area, Pingtung processing export area and agricultural science and technology park is no use of high-risk species of the factory and the process exists. According to the process risk index calculation method, after estimating the risk potential of each industrial area in the area, it is known that the industrial area of ​​Pingnan Industrial Zone in Pingdong County is a high degree of risk, Pingtung Industrial Zone, Neipu Industrial Zone, Agricultural Science and Technology Park and Pingtung processing export area is a low degree of risk. Third, perimeter harmful pollutant testing The project completed the sampling analysis of harmful air pollutants in the industrial area by Canister. Fourth, the open path infrared light spectrometer (OP-FTIR) The project has completed this year 30 days OP-FTIR monitoring test operations, set up to Pingnan industrial area factory-based. 5, odor pollution control operations 1. The project implementation of the gas station inspection and sampling in the A / L ratio detection of a total of 66 stations; in the detection of air leaks a total of 66 stations 2. This year, the FLIR Auxiliary Execution Equipment Component Test Total 10 Processes, the number of detection of 3,000 device components Six, hydrogen sulfide air quality continuous monitoring station and odor odor event strain system maintenance The maximum concentration of hydrogen sulfide concentration was 11.47 ppb from January 1 to December 31, 2005 (the instrument calibration work monitoring data had been excluded), and the average concentration from January to December of January was 1.501 ppb. The wind direction was mainly from the west And the southwest of the West, the wind speed in about 0 ~ 3m / s range. 2. Smelly odor Strain system completed 1 to 12 months at least once a day routine on-site maintenance Seven, Pingtung Industrial Zone and Nai Po Industrial Zone Road dust self-management This year has completed a total of 163 times the factory site inspection operations, including Pingtung Industrial Zone 59 times, within the Po Industrial Zone 28 times. Eight, Pingtung County air pollution fingerprint database system The work team this year has completed the air pollution fingerprint database system hardware, software installation, and complete the system test operations.
Keyword
OP-FTIR、FLIR、Canister
Open
top