To the central content area

2016 Project of construction pollution control and inspection

Absrtact
This was which started in March 22, 2016 and ended in March 21, 2017. The primary objects are to give assistance with tighten up construction management business, including inspect and control of building sites, lay pipes and cables, and create governed construction sites information files for the EPB. By the methods, included publicity material, construction pollution conferences, construction site assistance, and educating the knowledge of pollution prevention to achieve the purpose of reduction pollution. To make every effort to raise performance results of air pollution prevention operation of the EPB and improve performance evaluation results from the EPA. The efforts are as follows. The rate of construction emission volume is 61.65 %, and the volume of PM10 is 1,088.33 tons. The declarations of air pollution fee for construction are 3,660 cases and air pollution fees amounted to 39,325,010 N.T. dollars. The project implementation results are as follows. Governed construction sites are 5,183 places and the amount of inspection for building sites are 7,275 times; sites information collected during routine inspection was created files on schedule;3 construction site pollution consultations were held. Constructors (50 sites) were encouraged to join the adopt-a-road program. The street cleaning operation was completed 29,029.02 kilometers, and PM10 volume was reduced 75.48 tons.
Keyword
Construction, Fugitive Particulate Source, Control Strategies
Open
top