To the central content area

Hsinchu City, 106 construction project pollution control plan

Absrtact
Hsinchu City, 106 Hsinchu City, the construction of pollution control program final report writing content, the main statistical results of the work until October 31, 106, by the Organization unit Consultants Enterprise Co., Ltd. to assist the implementation of Hsinchu City jurisdiction Construction of the inspection program inspection, management approach to check counseling, construction of air pollution fees collection and advocacy work, all work projects are completed according to the progress of the implementation of the plan, detailed implementation of the work methods and results of the chapters. Based on the idea of ​​improving service quality for the public, the Company continued to promote e-filing services in the construction of the project to declare the cost of clearing away pollutants. During the reporting period, a total of 551 construction projects were adopted to handle the application of empty-cost declaration, including 432 start-up declarations and 119 completed Accounting for approximately 38.9% of the total filings and settlements, representing an increase of 21.4% as compared with the same period of last year (of which, 432 cases were commenced, accounting for 56.4% of the total construction starts and completed e 119 cases were declared, accounting for 18.4% of the completed cases. The Company also continued to promote e-payment services for small-amount air and sewage charges in the payment of air and sewage charges. A total of 913 barcode payment forms were opened and the payment time was accelerated by 4.7%. In addition, 755 new projects were declared during the project period. A total of $ 13,655,929 was set aside for air pollution and a total of 27 secondary construction and repair works were seized. The air pollution toll was recovered at $ 574,823. In addition, with telephone notification and Send a document way, improve the rate of construction of air pollution declaration, so that construction of air pollution fees levied more appropriate and convenient. Control mainly based on the construction of air pollution control facilities management practices, with a hierarchical inspection, color single control, advise single notification and on-site counseling and other action programs, in addition to promoting the site to actively take preventive measures such as pollution control and road adoption . It has also put in manpower to carry out a thorough inventory of construction sites under its jurisdiction. As of October 31, 106, a total of 3,700 site inspections were completed. During the period, a total of 28 key projects were selected for key counseling based on the site size, construction period, lack of non-compliance or whether it was a major public project. The average reduction rate of pollution emission during counseling increased from 37.2% to 64.2% and the average lack of improvement The completion rate is 91%. In particular, the key area controls for the two districts of Guanpu and Old City were also promoted. The average reduction rate as of October 106 increased by 11.7%, better than the city average of 53.1%. Significant improvements were also found in missing points. The average number of missing points before control was as high as 11.7 points, down to 5.2 points after the control, a decrease of 6.5 points over the control level and an improvement rate of 55%. A total of 121 co-counseling road washing sweeping sites About 23.7 kilometers of homework and adoption, with a total cleaning time of 9,447 kilometers and a reduction of 130.4 tons of TSP. In addition, unmanned aerial vehicles will be used to carry out aerial work in the area this year. In conjunction with the on-site seminars, four construction projects will be conducted to increase the length of road adoption and the lack of improvement operations. It is estimated that an increase of nearly 21 km of cleaning mileage will be implemented each month, 0.29 mt of TSP, 0.055 mt of PM10 and 0.013 mt of PM2.5. Aerial survey of surveyed area images revealed two large areas of ground exposed areas, one for Tai Yan gravel yard and the other for Zhonghua Road 4 Section 451 Lanes open to the ground, after fixed source project and integrated management plan to improve the work of counseling, the scene of green vegetation 35%, effectively improve regional air quality. In promoting the implementation of homework, we strengthened the publicity through regulations briefing sessions, on-site workshops, and the electronic media, and promoted the effectiveness of publicity through diversified media so as to familiarize manufacturers with legal requirements.
Keyword
Hsinchu City, Construction project, Construction reduction
Open
top