To the central content area

Air Pollution Control Information Integration Project in the Offshore Industrial Park in 2017.

Absrtact
This project was carried out from August 16th, 2017 to November 13th, 2018. All work contents were completed as specified in the contract. There are eleven sessions of the information consultative Group Meeting. Air pollutants checking and controlling plan of outlying islands industrial zone are provided to Environmental Protection Bureau Yunlin County for their education and technical training. This research is based on the production and energy consumption of Taiwan’s etrochemical materials to understand the current usage of petrochemical resources and energy through material flow analysis. Updating and maintaining the central monitoring database integration system of outlying islands industrial zone. Base on the different properties of each database, different frequency of regular updating are applied. Moreover, proactive notification function has been built up in the central monitoring system.Four CCTV real-time monitoring system were expended in the project of this year. Environmental Protection Bureau has established four CCTV monitoring systems in the surrounding of outlying islands industrial zone so far. These four separate monitoring systems are integrated to the central monitoring systems via CMS (Content Management System). Through the integration, Environmental Protection Bureau is able to control the real-time status of outlying islands industrial zone and establish the complete network of live monitoring. Assist in emergency incidents occurring in outlying island industrial zone. We have assisted in emergency response in outlying island industrial zone for eight times, including reporting back related information and writing press releases, namely on November (three incidents), March (one incident), June (two incidents), July (two incidents) and October(two incidents). We aid EPA to grasp the relevant information and control the on-site conditions in the emergency response process. In order to offer greater convenience to citizens, we had erected 11 42-inch electronic billboard for teachers and students to check the real-time air quality information (AQI, SO2, CO, PM10, etc., and the standard value). The first training session of this project was held on January 30, 2018. The purpose of this training was to introduce operation of the environmental monitoring system of outlying islands industrial zone. Via the system, information and state of the plants can be controlled quickly during an emergency.
Keyword
Offshore Industrial Park, Material Flow Analysis, Information Integration.
Open
top