To the central content area

Pingdong County Old Diesel Large Vehicle Elimination and Installation of Filter Smoker Subsidy Review Program

Absrtact
Abstract The main objectives of the project include: the review, the assistance, the location of funds and the filling and filing of the dat of the subsidies for the elimination of the first- and second-phase large-scale diesel vehicles and the installation of the third-phase large-scale diesel vehicles with filter filters. The summary of the work is as follows: A. In conjunction with the relevant policies of the Environmental Protection Agency, the application for the elimination for the first and the second phase large-large-scale diesel vehicles and the installation of the filter for the third phases large-scale diesel vehicles of Pingtung County, and the number of examinations have reached 1,716 applications including the first and second phase of the subsidy application. 576 cases of smoke filter subsidy applications. B. According to the Environment Protection Administration Executive Yuan's (EPAEY) announcement on "Retirement of Old Large Diesel Vehicles" and "Subsidy for Adding Filters to Large Diesel Vehicles" (subject to the name of the official announcement of the EPAEY), review, assist and allocating funds for grant application cases business include the collection, review, registration, progress tracking control of the application cases, the notification of non-compliance with the reimbursement of the case, and the collection, archiving, filing and other operations of the case data. C. Within one month of signing the contract, the standard operating procedures for the review of the subsidy application for the removal of the first- and second-phase large-scale diesel vehicles and the installation of the third-phase large-scale diesel vehicles with filter filters will be reported, and the approval of the subsidy case will be conducted after approval by the Environmental Protection Agency. Matters should be completed within 15 days. Those who fail to meet the requirements of the regulations or lack of content shall be notified in writing of the corrections, the number of corrections and the number of correction days…etc., in accordance with the provisions of the subsidy. The project shall be applied for the payment of the relevant administrative matters and the project budget will pay for the relevant documents, postage and other administrative expenses. The relevant work shall be completed within 60 days and the supporting evidence of the subsidy received by the public shall be attached for future reference. D. Within one month of signing the contract, the application for the subsidy for the installation of the third-phase of a large-scale diesel vehicle with a filter filter should be made. The content includes at least a telephone interview and a real vehicle check, and the content is revised according to actual needs. E. The third-phase large-scale diesel vehicle will be equipped with a smoker filter subsidy case, and the on-site real-time vehicle inspection operation will be carried out. The inspection rate should reach 30% of the total number of appropriations, and the filter equipment manufacturers that have obtained the subsidy should be included. F. As for the third phase of the large-scale diesel vehicle, the owner or driver of the smoke filter subsidy case will be interviewed by telephone. The quarterly telephone interview will be conducted to grasp the updated condition of the use of the filter, and the record will be submitted to the Environmental Protection Bureau. The sampling ratio should be up to the previous quarter, reaching 25% of the total number of subsidy cases, and the filter equipment manufacturers who have obtained the subsidies should be all included. G. At least 4 times of seminar operation on the maintenance of the filter unit were conducted. The content should include the theoretical explanation of the smoke filter, the description of the principle of the vehicle adaptation, the on-site real vehicle maintenance/regeneration display and the troubleshooting method…etc. H. The seminar targeting the possible users, investigation and promotion and service should reach at least 300 person-times and service, and add a smoke filter operation and maintenance instruction meeting are held when there are less than 300 people. I. According to the requirements of the Environmental Protection Agency, at least 2 press releases will be issued to improve the exposure rate of the subsidy policy for the elimination of the first- and second-phase large-scale diesel vehicles and the installation of the third-phase large diesel vehicles with filter filters. Current status of implementation The main purpose of this project is to assist in the review of the first- and second-phase of diesel vehicles and the addition of the third-phase smoke filter subsidy case. It also provides 4 briefing sessions, publicity and interviews for 300 people and issues two pieces of publicity and other methods to promote the EPD diesel vehicle subsidy policy, and to calculate the benefits of air pollution reduction, and the diesel vehicle program is responsible for strengthening roadside interception, visual inspection, self-management and other discipline inspection of old diesel vehicles, strengthening the speed of old-age and reducing the harm of particulate pollutants. Till December 31st, 2018, at present, the progress is generally in line with the contract time schedule.
Keyword
Diesel Large Vehicle、Elimination、Filter Smoker
Open
top