Prevention and promotion to improve river dust programs of Jhuoshuei River in 2017
Absrtact |
This plan was from May 8, 2017 to May 7, 2018, all the works has been completed within schedule. A brief description will be given of the results of the implementation. Statistics shows Lunbei monitor station's unhealthful days has gradually decreased after 2016. From 1 days in 2016, 13 days in 2017. Mai Liao monitor station's unhealthful days From 12 days in 2017, 10 days in 2017.
The project uses satellite aerial map to analyze the exposed beach area of zhuoshui River over time. The bare beach area is reduced from 1,185 hectares in March 2017 to 1,184hectares in July 2017. June 2017 heavy rain changes zhuoshui River brook bare ground. Exposed land is transferred from the downstream estuary to each district. The area of bare beach land during the non-flood season increased to 1,611.7 hectares in January 2018. Under the efforts of all units, the bare beach area has been reduced from March 2018 to 1,161.3 hectares.
Overall it completed a total of 295 actual inspections,including the routine inspections and the inspections on an unhealthful day. To collect and record the situation of the floating dust of the zhuoshui River for further analyzes.
And with unmanned
|
---|---|
Keyword |
Dust, particles
|