Summary of results:
The project has been implemented since March 23, 2006 and ended on December 20, 2006. The project is forecasted
Set the progress of work, there is no backward situation.
First, inspection control and sampling
For the city water pollution control projects and tap water source water quality protection zone for the following control
operation:
1. The work team has completed the jurisdiction of the cause of management (with the control number or EPA designated new things
Industry inventory object) inspection operations a total of 144 times; only one community during the period (green leaves
Villa) due to sewage facilities failure caused by the lack of follow-up has been required institutions to complete
improve.
2. For the jurisdiction of the construction site has completed 21 sub-sampling inspection operations, part of the site by hand
Sampling grit chamber water quality and found that the detection of pH value exceeds the regulatory standards (≧ 9) case, speculated
Should be affected by grouting operations within the work area, which requires the industry should strengthen the grit chamber clean-up,
In order to maintain the desalination basin should have the functionality.
3 inventory area waste (sewage) aqueduct discharge part, has been seized 3 dark tube, and by the 7th announcement
After the completion of sealing operations.
4. Has completed the first ~ four seasons Xidin River, Namrong River, Asahikawa River, Tianliao River and other North River Department of the river
Water pollution indicators Water quality monitoring operations, of which 52 points in the sample, are not (slightly) contaminated
Only 9 o'clock, there are 8 times the mild pollution, moderate pollution is 19 times,
Belonging to a serious pollution of 15 points times; after the investigation of domestic sewage into the river, and the river
Small flow rate and low flow rate, resulting in higher concentrations of pollution.
Second, pollution sources file and investigation
1. Six clogs were delivered in November and water from the Dawulun Industrial Zone was discharged into the water in Keelung River Basin
Material contribution, and based on the operating parameters of sewage treatment plants to deal with functional pollution reduction
Policy and Feasibility Assessment.
2. In November sent to the cause of management satellite positioning, mapping pollution sources and the river station
(Including the North Harbor River) and drainage location diagram, and point source pollution assessment.
3. In November, the "Regulations Governing the Promotion of Total Water Pollution Sources" promulgated by the Environmental Protection Department
Proposed to give priority to the implementation of total control of the target water body.
4. To complete the assessment of the river water quality objectives under the conditions of allowable pollution emissions.
5. Ji (patrol) access to upstream and downstream sewage outfall sewage chemical plant storage facilities, and add
Strongly advise and counseling the establishment of emergency response facilities, completed 11 secondary storage facilities business certification
Check the propaganda and counseling operations.
Third, the operation of the water environment watch help patrol team
1. Two environmental patrol team environmental education seminars have been held and the "Water Environment Notification System"
Mode of operation, river water pollution incident notification procedures, as well as simple water quality testing and other projects
Be explained.
2. A total of 30 cases were interviewed during the project patrol team informed the case, have completed the site clean-up work.
Fourth, continue to promote the permit system:
1. Has conducted two sessions of water pollution prevention and treatment of propaganda briefing session, for the management of representatives of institutions
To carry out water pollution law-related regulations, to remind the industry on a regular basis to declare.
2. It is provided that from March to December, the extension of the permit should be completed and the period of validity of the permit has expired
Apply for a list of delays and take the initiative to inform the industry on the phone before the deadline for handling the matter
Reason extension.
3. According to the schedule to send March to December monthly work report and first quarter report.
Fifth, water pollution prevention and control system database control:
1. From March to December, for the water pollution prevention and control system database, respectively, the rationality,
Correctness, or anomaly screening operation, no abnormal situation was found.
2. In response to the "Water Pollution Source Information System", "EPD Training Offices set up a dynamic network
Page "," Environmental Management Department of the Executive Yuan Control Numbering System "and other water pollution prevention
The computer database required for business continuity is maintained and updated.
VI, November 23 for river pollution prevention training a professional, professional equipment manufacturers invited,
In response to members of the Pollution Emergency Response Team, training in river pollution prevention and control, training content
Contains equipment decontamination principles, application restrictions and maintenance points.
Seven, on December 20 for river pollution emergency response exercises a scene, the main content of the exercise
To river oil pollution treatment.
Eight, 8.48 tons of river rubbish have been removed during the project, with a total of 71 manpower
Off garbage and recyclables are sent to the sky outside the incineration plant, or recycling of resources to deal with and improve
Water quality of Xidi River and Dawulun Stream.
Nine, a daily review of the cause of the water quality management of automatic monitoring and recording video surveillance system stability
For mastering the discharge water quality of WWTPs and Xiehe Power Plant in Dawulun Industrial Area,
There are unusual circumstances.
Ten, drinking water source water quality protection:
1. The raw water quality of the four water purification sites in the first to fourth quarters has been sampled and seven water intakes
In the second quarter, due to the cooperation of the Hong Kong Bureau of Water Resources,
Work, resulting in detection of E. coli significantly increased to 15,000, 18,000
CFU / 100mL, the other test results are not beyond the standard value.
2. On a regular basis with the jurisdiction of the District Water District Office, for the new mountain, west potential of two reservoirs micro
Cyst algae inspections, all found no algal blooms.
XI, drinking water safety management:
1. The sampling of 394 tap water supply systems has been completed and the test results are in accordance with the drinking water quality
Standard specification.
2. To complete the first four seasons of water works clean water outlet and raw water quality testing, seized
Test results were in line with drinking water quality standards and drinking water source water quality standards.
3. Has completed 36 wells, spring water and other simple tap water quality inspection sampling, phase
Guan water is not suitable for direct health drinks.
4. A total of 184 inspections of continuous water supply fixed equipment for public drinking have been carried out in line with the requirements
Drinking water quality standards.
5. Has handled the first four seasons within the jurisdiction of the water purification water purification agent check, of which six blocked water
Field and well-being of the procurement of pharmaceutical agents include polyaluminum chloride, sodium hydroxide and sodium hypochlorite three,
Warm water purification plant site and Johor Bahru (JB) Purification Plant purchasing polyaluminum chloride, sodium hydroxide and other two
Species; and the four water purification sites in the various heavy metal testing projects, no over-standard items, in line with
Tap water treatment Pharmacy testing standards.
6. Has conducted the first to four quarters of the jurisdiction of the packaging or costumes of the drinking water industry, the check is now the city
Only one remaining place (Kok Cheong General Factory Co., Ltd.) drinking water supplier did not experience any inspections
Existing violations of relevant norms of the situation.
7. Cooperate with the 106 annual inspection of drinking water management key audit of the inspection business.
Twelve, community sewage inspection control and counseling:
Has completed 38 community sewage sewer facilities permit check, water quality sampling;
Some communities of Escherichia coli high, the rest pH, temperature, BOD5, COD and SS and other tests
Item meets the standard.
Thirteen, factory evaluation
For the jurisdiction of the five business units in the September 25 and 26 factory evaluation, and at 8
The initial assessment report will be completed on the 30th and the re-assessment operation will be conducted on October 23 and 24, October
On the 27th to submit a duplicate review report.
Fourteen, has conducted 21 Jurisdictions Campus hydrophilic environment advocacy activities, the total number of students participating in up to
786 people to take root in the downward development model to enhance the concept of protection of water environment for school children.
Fifteen, has completed 22 sub-water pollution fee reporting institutions to check the suspicion;
Information is non-negligible, or in error, also in line with the original declaration of information content.
Sixteen, for ocean pollution drills and professional training
1. On October 3, 106, successfully completed a formal exercise of marine pollution emergency response 1 session, combined
Civilian forces to improve the performance of dynamic dynamic units of each unit in the oil pollution contingency horizontal and vertical joint
Department of the ability to look forward to in the rivers, marine oil pollution damage to the marine environment when the damage
To the minimum.
2. On October 26 and October 27, 106, we went to Bujang County in Jiayi County to study and learn from other counties
Practice by outside counties to enhance the experience of the relevant sea-water personnel in this Municipality.
3. To carry out marine pollution emergency equipment exercise equipment, supplies parts maintenance work include: inventory
Warming Container Terminal and Renai District Container Terminal Equipment, and equipment manufacturers check inventory, replace the generator
Battery and brush-type hood battery, high-temperature and high pressure cleaning machine rust and throttle repair work,
Currently related equipment can operate normally. .
4. For Keelung EPA-related emergency equipment for pollution emergency, to complete 3 sessions of cleaning, maintenance
Maintenance, inventory and other curb work, have restored their original performance, which can effectively enhance the overall marine oil
Strain working energy, in line with the EPA assessment requirements. Another for the warm area container house should be emergency
Equipment replacement equipment placed around the container house environment weeding and cleaning and maintenance work 2 times.
Seventeen, for the city's marine pollution inspection control operations:
1. Has implemented the 50 merchant ships, 50 fishing vessels ship inspection control operations; check the relevant text
Pieces of the inspection are in line with the provisions of the pollution did not find any violations.
2. The harbor inspection control operation has been carried out 152 times; any environmental disturbance found during the inspection process
Situation, immediately notify the Baduzha fishing port management station, or Zhengbin fishing port management station for removal.
3. The implementation of pollution source inspection and control operations; in charge of Keelung area under the jurisdiction of public and private places were
Taiwan's PetroChina Co., Ltd. Keelung Port (Keelung Oil Supply Service Center) and Taiwan Power Company Concord
Power plants, check the permit list in June and November respectively.
Eighteen, during the plan for the city of various public and private units to conduct inventory surveys and establish contacts clear
Book, update marine oil pollution and chemical pollution equipment map (content items, specifications,
Quantity, equipment status, contact information and other information), and in accordance with the EPA risk map production,
Completed 106 Keelung city marine oil pollution risk map update and the city commercial port and fishing port
Marine Pollution Strain Energy Assessment.
Nineteenth, to promote advocacy to create a green port environment
1. The project actively checks and polices the refueling operations when inspecting the cleanliness of ships and port areas in accordance with the regulations
Surrounded by barriers to inform captains (including foreign fishers or fishermen) of the waste of fishing vessels should be true
Take it back to the shore for collection and disposal. Do not abandon ship's waste into the sea and the harbor. In addition,
To promote the removal, reduction, classification and recycling of waste in the port area and enhance the marine environment
Border protection concepts, special invitation to the port authorities, owners and harbor fishermen (fisheries), at 106
On September 25, 2010, a meeting of the Marine Environment-related Law and Regulation Conference was held.
2. November 10, 105 for the city's public participation in marine prevention and control work, experience the city life
Outdoor activities 1 event.
Twenty, has handled the first four seasons water quality testing sampling, the test results found no abnormalities
Love line.
Twenty-one, to promote private participation in marine pollution prevention and control work
1. Continuing to maintain the normal operation of the four marine environment patrol teams in this Municipality and handling 1
Event Education Conference.
2. For the city offices, residents, tertiary institutions, the Marine Environmental Patrol Team, Keelung area fishing
Will, fishing port management station, Keelung Port Branch, Taiwan's oil companies and Keelung sea pollution
Strain and Equipment Management Unit, to complete the Marine Environment Education Association 4 sessions, the cumulative out
The number of seats reached 2,139.
Twenty-one, seabed (drift) garbage removal and marine environmental education advocacy:
1. Nearshore (drift) garbage preliminary investigation: for the various scenic spots and coastal survey sea
Garbage distribution hotspots and garbage removal assessment has been completed 5 times to mobilize divers 164
The number of people, about 855.6 kilograms of clear seabed trash.
2. After the completion of production and related 5 minutes of the essence version and 20 minutes full version of the achievement video 20 copies.
Twenty-three, the relevant administrative work
100 copies of propaganda and propaganda materials for river pollution prevention have been sent and used as propaganda activities