According to the contractual norms work items and contents, in accordance with the requirements of your bureau, we completed the stipulated work items and submitted work results reports in the first half of this month. We first submitted the results of the previous month's performance reports to the end of each month. By the end of 106, A total of 85 consents for execution of site self-management were signed (50 new additions were made), a total of 85 (up to 50 new additions) of road care were washed, a total length of 47,649 kilometers was washed, a total of 4,078 inspection visits were carried out for construction and construction works, A total of 2,410 pieces of levies and rewards (collected / rewarded items) were collected, 476 pieces were implicated, and the rest of the work was listed as follows in order:
(A) inspection of regulatory operations
Statistics show that there were 4,078 inspections on construction site pollution control in 106 cities, of which 1,169 were for Hualien City and 862 for Ji'an Township, with the highest pollution load in each of the townships and cities, followed by Nei-Shiang (377) and Xiulin ( 278). The average number of monthly inspections was 340. In terms of project category, there were 2,152 other works and 1,038 construction (RC) works, which were the major inspections.
In terms of the number of inspections, a total of 259 inspections have been conducted so far that the construction (housing) project - with the largest share of reinforced concrete structures, followed by other works and roads (tunnels) - roads. In terms of the number of inspections of townships and townships, Hualien City and Xulinlin Township are the key inspection areas.
In order to implement construction site noise control, at present, the project staff implemented a total of 72 construction site noise audits for a total of 106 years. Noise measurements were carried out on major construction equipment at the site, including strange hands, cranes, crushers, ready-mix trucks, etc. The equipment prone to noise source was measured according to the law, Leq and Lmax, the measurement results are in line with noise control standards, Leq measurement range between 55.0 ~ 74.5dB (A), Lmax measurement range 67.1 ~ 86.4dB (A )between. Projects with higher Lmax values are mostly concentrated in excavation and pile work.
(B) one, two project control rate and regulatory compliance
In 1996, a total of 3,640 construction sites were covered, representing 992 of the first-level projects, accounting for 27% of the total; 1,680 of the second-level projects accounting for 46% of the total; 968 of the third-level projects accounting for 27% of the total; 2,531 Of which 808 were surveyed by the first-level engineering survey, with an acceptance rate of 81%, 1,680 inspections at the second-stage project and a 72% acceptance rate. The overall construction management rate in Hualien County was 70%.
In terms of compliance with laws and regulations, the compliance level of first-level engineering laws and regulations was raised from 81% in January 106 to 92% in December, and the compliance level of second-level engineering laws increased from 84% in January 106 to 90% in December. The compliance level of the general laws and regulations 91%.
(C) construction project air pollution control fee collection business
Statistics The air pollution prevention and control fees for the construction of this county totaled 56,200,000 yuan and 0,770 yuan in 2006, of which dwelling was up to 20,215,060 yuan, accounting for 36% of the total levy, and the toll of the sub-road engineering category was 13,971,072 yuan, accounting for the total amount 25%. The total amount of tax levied in this county was 58,030,200 yuan in 105 years, and the amount collected in 106 years was 5,620,757 yuan, a decrease of 1.82,927,000 yuan over the previous year. The main reason for this was that the government restricted the construction of farmhouses and applied for 106 years of construction In addition, in the road engineering section of 106, although the number of declarations increased by 22, the amount of collection decreased by 9,429,837 yuan, the reason is due to the number of road works to declare although However, the construction period is shortened, which shows that the construction scale of road projects has been significantly reduced in 106 years.
Construction projects will be subject to changes due to project types, shorter construction period, reduced construction area, reduced contract costs, or stop working for an application fee back, 106 counties due to reduced contract funds apply for refund the most, a total of 343 , A total of 998,138 yuan for the refund; followed by a shorter period of time to apply for a refund 120, a total refund of 180,777 yuan.
(D) construction project air pollution fees Ji reminder homework
Statistics According to the database of construction and construction database in 1996, a total of 19 construction sites were declared for construction-funded sewage charges, including 14 other types of projects, 4 construction projects (RC), 1 pipeline project, and construction and construction projects The fee was NT $ 84,701 and the late fee and interest was NT $ 3,634. The total amount was NT $ 80,335. After the payment was completed, the fee was completed and the call rate reached 100%.
(E) to help inform the disposal operations
From January to December of this year, a total of two incidents have been imposed on construction and construction works for the air pollution prevention and control fee before commencement of construction. The total amount of the penalties is NT $ 101,500. A total of one office for littering reasons , A total penalty of NT $ 100,000, because the number of missing points on the scene for more than 10 points did not meet the regulatory approach to a total of 1, the amount of penalties totaling NT 10 million. In 2006, a total of 4 penalties were imposed on construction and construction work, and all four sites had been improved through counseling. Compared with the previous two years, the construction site actively inspected and advised to improve and reduce the number of cases of sanctions. The project will continue to diligently inspect and continue to supervise and supervise the implementation of prevention and control measures in order to enhance the compliance with laws and regulations of the construction site of the county. In recent years, the main reason for the announcement is that the application was not made before the commencement of construction and did not comply with the management measures.
(6) Noise control of motor vehicles and investigation of non-ionizing radiation sources
A total of 52 vehicles intercepted (searched) during the program period were checked and intercepted by the police on the basis of the noise level of vehicles. A total of 522 vehicles were intercepted (check-up) and the relevant records of testing operations were collected and executed by the undertaking unit. Procedures, unqualified vehicles will be notified as a notification object.
In addition to conducting interception (search) operations according to the work items, it regularly relies on noise vehicle registration websites and police serenity project materials to collect suspicious noise vehicles for the purpose of screening and assisting in handling administrative procedures and on-site inspection operations During the painting period, a total of 88 steam locomotives have been notified and seized. A total of 36 steam locomotives were checked and checked by roadsides, 18 noise car sites, 3 police units were moved in, and other counties and cities moved in Then there are 28 vehicles, more than 3 times for the public to report calls.
This year, the county should perform non-ionizing radiation measurement operations for more than 50 times, and the program has completed 52 points in the year.
(7) Control over the flow of business waste
Statistics 106 years for the county built within the jurisdiction of waste removal and disposal agencies 51 inspections of a total of 562 times, the jurisdiction of the county under the jurisdiction of GPS vehicle inspections and inspections of 10 a total of 187 146 were consistent with operational requirements, the administration Environmental Protection Department Environmental Protection Agency Industrial Waste Removal and Transport Equipment Immediate Monitoring System Check once a week for a total of 51 times 3,588 items 687 items. A total of 1,343 pieces of waste pipe factory (field) business and construction sites were inspected. A total of 76 waste examination papers were reviewed (paper) for a total of 106, construction completed and dissolved a total of 102 (1 without the need to send unscrupulous). Part of the construction project please empty the air pollution counters to submit a weekly list of newly declared construction sites for the week, bringing a total of 2,412 52 times, 83 new executives.
Statistics 106 County illegal dumping sites in a total of 64 64 inspections, relocation of the prosecutor 14 units (including a court ruling), moved to the relevant units 3 pieces, 12 pieces have been cleared, for example A line inspection, according to a penalty at 1, a deadline to clear one is expected to handle a survey, the investigation is an illegal dumping 1.
(VIII) Innovative Practices - Application of Aerial Vehicle Investigation Technology to Unmanned Vehicles
For aerial workings of 10 large-scale pollution projects with a construction area of more than 5,000 square meters in the county, aerial work at construction sites (7 dredging projects, 1 construction works, 1 bank protection works and Suhua alteration works) was carried out. During the aerial photographing operation, seized 218 ~ 237.244 ~ 245 Jiuding section of Xiuhulin Township and No. 0343-0000 landlot of Xiulin Hsienxianguotu area with large area of undeclared heaps. Excavation of earthwork pile, did not start before the declaration of air pollution control costs and set the relevant pollution control measures. Two cases were set aside for a total penalty of TWD 200,000. After the intensive counseling, the case was completed on August 15, Among them, the status of 0343-0000 land No. has been restored and completed and improved. Dug excavation section 218 ~ 237.244 ~ 245 ground heap area has been declared, the control measures are in line with the provisions of the management approach. Follow-up and found Mizuho Mizuho section No. 2477 heap material accumulation situation, the Mizuho Spring International Tourist Hotel was found outside the stacking area. Subsequent applications have been completed declaration of sewage charges, the control measures are in line with the provisions of the management approach. In 106 years, a total of 10 site aerial photographs were completed, and the GIS data collection system was used to carry out the integration analysis of the collected data, emission estimation and area calculation. All the data in the site form were complied with the current site conditions.
(Eight) other
Manpower and Material Support: All are handled according to the instructions in the bureau.
Temporary handling matters: all according to the instructions of the Council to assist in handling.
Nine, the completion rate of the project this period: 100%, schedule control rate: 100%.