To the central content area

Pingtung age sandstone hearings in 2006

Absrtact
Remarks This Bulletin Board Execution Fiscal Year 106 "Pingtung Age Sandstone Commentary Traffic Control Measures", due to the execution period In the 106th year from June 24th to the end of June 23rd, 107th May, the current year stopped May 30, 107, Outline of the work content improvement results Outline Summary Row Explanation: 1, column sand sand stone place review work    Last year, May 30, 107 Common column 72 sand sandstone, 60 houses in the process, 12 temporary stoppages, 533 inquiries for the temporary suspension, 100% tooling progress +. 142/5000 原文語言: 中文 Three, Factory Zone source inspection and control system Column pipe 72 House sand stone floor factory sand Ishihara material Total deposit About 612.66 million yen, higher than the amount of trees deposited, amount of residence 260.64 million yen, 佔 total deposit amount 42.5%; Total deposit amount: 248.96 million yen, deposit amount 40.6%; deposit amount Third high income tax rate: 68.35 million yen, Total deposit amount: 11.2% Four, sand stone field empty product defect emergency change mechanism Total of this fiscal year Total completed sand stone field Air conditioning Quality deterioration Emergency control Squadron correction, Social assistance 16 house sand stone grounds Jewelry items jewelry pollution control measures books. Execution of empty goods defective defect report total meter completed 13744 house next, field failure rate severity 1775 house next.
Keyword
Sand stone, sand stone car.TSP
Open
top