The overall progress of the project from the date of performance (February 14, 2007) to November 15, 107 reached 99.82%. The work items have been completed substantially, and the progress is in line with expectations. Before December 20, 2007 Up to 100%, the main points are as follows:
Groundwater monitoring wells and dry seasons test results control pollutants have not exceeded the groundwater control standards, only ammonia nitrogen, iron and manganese have exceeded the monitoring standards, and the same results as the previous years, six riverside sports park (C00032) trichloroethylene 0.0625mg/L in the first season, 0.0713mg/L in the second season, 0.0514mg/L in the third season exceeds the control standard (0.05mg/L); Liuhe Riverside Sports Park 101 (C00033) Trichloroethylene in the second quarter 0.0747mg /L exceeds the control standard (0.05mg/L), it is recommended to keep track of it and compare it with the value of groundwater monitoring well in China Electronics' self-monitoring site.
Completed 24 inspections in the first half of the year and 29 inspections and maintenance operations in the second half of the year; there was no abnormality in the overall results of the internal function check. According to the results of the inspection, six riverside sports parks and Mingde gas stations were rebuilt to make wells and Dawulun industry. 4 warning columns are repaired in the district. It is recommended that the 108 maintenance and update recommendations be prioritized: Beidu Automobile Co., Ltd., Fuji Weaving (next to the guard room), Maling Elementary School, Concord Power Plant, Fujie Weaving (next to the sewage facility) , six sewage treatment plants and Xingye Metal Co., Ltd.
Completion of well condition assessment and completion: seven blocks of Baifu Park Management Station, Seven Blocks of Liuhe Riverside Sports Park 101 and Taifei Kelong Plant (upstream well) and five small national small, foreign material exclusion: Taifei Kelong Factory (Upstream well), Baifu Park Management Station in Seven Blocks, Liuhe Riverside Sports Park 101 in Seven Blocks, Wuguo Guoxiao and Fujie Weaving (next to the guard room), it is recommended that the value of K in the 108th year be less than 10- Six perform well condition assessments, such as the Taifei Kelong plant (downstream well), six sewage treatment plants, and the Mingde gas station.
For the Shimen Oil Supply Center-eight blocking reservoir area, 13 soil sampling and 8 groundwater sampling were performed. The soil testing results did not exceed the control standard. The MW5 groundwater TPH exceeded the control standard by 3 times, but the groundwater well was the standard monitoring well. There are still doubts. The unit should be asked to submit relevant certificates. If it is not possible to clarify, it is recommended that the Environmental Protection Agency set up standard monitoring well sampling. If the pollutants exceed the control standards, they will be announced as control sites according to law.
According to the needs of the Environmental Protection Agency, the Tianyu River is the main test object. The sampling results in the first 1-4 seasons, the copper, mercury and zinc of the financial mouse bridge exceed the upper limit of the quality index; the mercury, copper and zinc of the Xianglong Bridge exceed the upper limit of the quality index; the mercury of the BMW Bridge Zinc exceeds the upper limit of quality index; Mercury and Zinc of Meiqiao Bridge exceed the upper limit of quality index. There is no factory in the vicinity of Tianyu River and there is no significant difference between the data and the baseline survey data. The preliminary judgment of non-external pollution sources is presumed to be It is possible that the early stage of the Taiwan Fertilizer Keelung No. 2 Plant was announced as a soil pollution control site (arsenic, copper, lead, and mercury exceeding the standard) in 1997. It may be caused by scouring or sedimentation, but there is no fishing and play in the Tianyu River. In the case of water, the chance of direct contact with the sediment is very low, and there is no risk of health risks.
Completion of 2 regulations and briefing sessions, invited the Chief of the Environmental Protection Department of the Foundation, Ke Xianwen, and the head of the team to serve as lecturers, with a total of 94 attendees; completed one business education and training, and invited the Environmental Protection Agency's Foundation Foundation Xu Jiajia to serve as a lecturer. The number of attendees was 30; the completion of 11 campus promotion, totaling 217 teachers and students. Through the recycling of the questionnaires, we can learn that the operators will affirm the handling of the briefings. In addition to continuing to regulate the regulations, we can consider the actual needs of the operators. We propose to increase prevention and management, practical techniques and soil assessment surveys and testing data. Attention should be paid to the key points, etc., which can provide reference for the industry to strengthen the management end; business personnel education and training and cross-county exchanges have practical benefits for business management, and it is recommended that the follow-up can be handled according to the actual needs of the Environmental Protection Agency; the campus promotion activities are easy to understand. The lively and interesting way of interacting with schoolchildren can usually achieve better publicity results. It is recommended to continue to handle and establish the concept of schoolchildren's understanding and protection of soil and groundwater.
The PCDDs/Fs content of the perimeter soil of this Municipal Incineration Plant is low (far below the control standard), and there are 2 soil samples among the 7 soil samples (107-05-S-4 and 107-05-S-5) The PCDDs/Fs are slightly related to the fly ash of the incineration plant, but it is difficult to determine whether the overall perimeter soil is associated with the incineration plant emissions. From the small sample data of limited resources this year, it can still be found that the heavy metal in the perimeter soil samples of the incineration plant is not much different from the general soil quality, and all of them meet the relevant pollution control standards. The heavy metal fingerprints and incineration plants in the soil are known from the current data. The boiler ash and the reaction ash should be irrelevant. The upstream and downstream groundwater monitoring wells and dry seasons test results have no pollutants exceeding the control standards. Compared with the 106-year incineration plant self-test data, there is no abnormality in water quality.
5 companies have proposed to stop the business, and after the data comparison and the current survey, it is not the designated announcement business listed in Articles 8 and 9 of the Soil Pollution Control Law.
The Green Leaf Mountain Village was attacked by the public and soil samples were taken 1 time to analyze semi-volatile organic compounds, volatile organic compounds and pesticides. The test results did not exceed the regulatory standards.
As of November 30, 2007, the score on the evaluation line was 95.6 points. The 107-year evaluation focused on the registration and establishment of site data. In 108 years, it was managed by the information system program box, and will be checked for the information registered. In addition to immediacy, the inventory data is correct, so future site management should strengthen administrative timeliness, data correctness and active management.