Project Name: 107 Keelung City Marine and Water Environmental Pollution Prevention Plan and Marine Environmental Education Promotion Plan
Organizer: Fulian Engineering Consulting Co., Ltd.
Schedule for signing the contract: March 26, 2007 to December 15, 107
Execution of quantitative target statistical interval: March 26, 2007 to December 15, 107
Since the signing of the project, the progress of various water environment inspections, inspections, promotion and administrative coordination matters have been carried out in accordance with the provisions of the contract, and the final goal has been successfully achieved. The contents of the work and the progress of the excerpts are as follows.
I. Inspection and control of the management of the business and sampling operations
(1) Liaison business
1. There are a total of 77 listed companies in the jurisdiction. After deducting the waterworks, some new facilities have not been operated, and no sewage treatment facilities have been set up, at least one inspection has been completed, and the achievement rate is 100%.
2. Business routine testing items include: pH, water temperature, SS and COD.
3. The project has completed 140 inspections and inspections and 121 inspections, and achieved an annual target of 120, with an achievement rate of 117 and 100%.
(2) Construction site
1. This work is based on the construction site with the control number and the project of "construction site runoff wastewater pollution reduction plan".
2. Routine inspection projects at the construction site include: pH, water temperature and SS. Check the inspection to see if the function of the grit chamber is normal.
3. The project has completed 20 inspections and sampling operations, and achieved an annual target of 20, with a completion rate of 100%.
(3) Concealed pipe: Inspect the waste pipe of waste (sewage) water in the Dawulun Industrial Zone, complete 3 announcements and sealing operations, and achieve 3 annual targets with a completion rate of 100%.
(3) Concealed pipe: Inspect the waste pipe of waste (sewage) water in the Dawulun Industrial Zone, complete 3 announcements and sealing operations, and achieve 3 annual targets with a completion rate of 100%.
2. Management of water pollution prevention and control in industrial areas
(1) Dawulun Industrial Zone
1. The sewage plant discharge water is completed once a month for inspection and sampling, and the total execution is 12 times, including 6 night inspections; the annual target is completed 12 times, and the achievement rate is 100%.
2. The surface runoff is completed once a season, and the total number of samples is 4 times. The annual target is reached 4 times, and the achievement rate is 100%.
(II) Six industrial zones: The discharge water of the sewage plant will be completed and inspected once a quarter, and the total execution will be 4 times. The annual target will be reached 4 times, and the achievement rate will be 100%.
3. Inspection and control of community sewage and public sewerage systems and counseling operations
(1) Auditing operations
1. Inspected the number of community-managed communities in the jurisdiction (including 7 schools), after deducting the non-operational (such as the construction of Yuda Construction and Boyuan Construction) and taking over (such as Guoyang Dadi Community, etc.) At least one inspection was completed, and the achievement rate was 100%.
2. Community testing programs include: pH, water temperature, SS, BOD, COD and E-Coli.
3. The project has completed 52 inspection and verification operations, achieving 50 annual targets with a completion rate of 104%.
(2) Improvement of the function of the sewage sewer system and building sewage treatment equipment
The team checked the community that detected abnormal water quality in the sewage treatment facilities last year, and has assisted the six Fujinghua and Fangdi communities to complete the improvement, and meet the discharge water standards. The community has reached the contractual requirements, and the achievement rate is 100%.
(3) The community permit is not extended and will be counseled, consulted and assisted in obtaining the permit.
This year, the work team has coached 6 communities whose community permits have been overdue, completed 5 community license extensions and 1 community access to public sewers. The number of community targets that have reached the contractual requirements is 25%, and the achievement rate is 250%.
(4) Checking the operation of the public sewerage system
1. The public sewage sewer in the jurisdiction is one of the Peace Island Water Recycling Centers.
2. Test items include: pH, water temperature, SS, BOD, COD and E-Coli.
3. The public sewage sewers are sampled once every 2 months for a total of 6 times; the annual target is achieved 6 times, and the achievement rate is 100%.
(5) Handling the briefing session and the propaganda guide for the formalization contract of the community sewage treatment equipment and facilities; it has been held in the conference room on the 2nd floor of the 6th/29th Keelung Cultural Center, completing one of the contract requirements and sending Environmental protection carrying 200 cups, the achievement rate is 100%.
4. Filing, investigation and checking of pollution sources
(1) The satellite positioning has been completed in the escrow management business, and the pollution source and the river station (including the Beigang River) and the drainage position map have been drawn.
(2) The papers and electronic files are established in all the auditing records of the plan, and quality control is carried out.
V. Tianyi River Water Quality Testing
(1) Water quality testing is carried out for the upper reaches of the Tianyu River (Qianziqiao), the middle reaches (the first season is the BMW Bridge, the Xianglong Bridge from the second season) and the downstream (Jinji Bridge).
(2) The testing items include: water temperature, pH, DO, SS, BOD, COD, NH3¬-N, mercury, arsenic, chromium, cadmium, lead, zinc, nickel, copper, total nitrogen, total phosphorus and so on.
(3) Tianyu River completed one sampling per season, totaling 12 points; achieving an annual target of 12 points, achieving a rate of 100%.
6. Continue to promote the licensing system
(1) Notifying the operator to apply for regular reporting
1. Establish special lines and resident personnel to be responsible for accepting applications for water pollution prevention and control licenses of public institutions.
2. In order to effectively manage the license documents of the management business within the jurisdiction, the work team will report the extension list for the past three months in the monthly work monthly report, and notify the cause or community by phone to avoid the cause. The circumstances of being overdue.
(2) Handling the water pollution prevention and control regulations
In the conference room on the 2nd floor of the Cultural Center of Keelung City on 6/29 and 10/5, a statute briefing session was held for the community and business, and 2 sessions of the contract were completed, and the achievement rate was 100%.
(3) Providing a list of permit extensions and review of the ring technician
The work team provides a list of the list of license extensions and the list of license expiration dates that have not yet been applied for extension in the monthly monthly report, and notify the cause or community by telephone as soon as possible.
VII. Water pollution control fee management
The work team cooperated with the EPD to provide 106 suspected water pollution fee collection services for on-site inspections (12), and another one of the Suiji hospitals. A total of 13 on-site inspections were carried out, and the achievement rate was 130. %.
8. Maintaining stable operation of water quality and quantity automatic monitoring and video surveillance facilities
This work is carried out by the resident staff to check the system connection daily, and if there are abnormal obstacles, the obstacles are eliminated to ensure the stable operation of the system.
9. Water pollution control system database control
For the "Water Pollution Source Information System", "Marine Pollution Prevention and Control System", "Development of Dynamic Webpages for EPD Training Officers" and "Administrative Environmental Protection Department Control Number Unified Management System" is equivalent to completing the work within one month Carry out the construction and update of the system.
X. Evaluation of Wastewater Treatment Facilities
At 8/17, 24 and 9/20, six sewage treatment plants in the six industrial zones of Keelung City, the industrial bureau of the Ministry of Economic Affairs, Dawulun and Ruifang Industrial Zone Service Center sewage treatment plant, Fuji Weaving Co., Ltd.
Five companies, including Yongsheng Development Industrial Co., Ltd. and Peace Island Water Recycling Center, conducted evaluation of waste water treatment facilities.
XI. Water Environment Watch helps the patrol team to operate
(1) After integrating the opinions of the patrol teams this year, the patrol team tools were enriched in November.
(2) Establishing a dedicated line and stationed personnel to receive the notification and grievances of the patrol team, and assist in case handling and document management. 38 notifications have been completed as of 11/15; 35 annual targets have been achieved with a completion rate of 109%.
(3) When the second statute briefing session was held, the team consulted and coached the volunteers for the 30 patrol members participating in the activity. Among them, Dawulun captain Huang Zhengwei was willing to participate in the volunteer training course, so it was completed. Consultation and counseling work, follow-up if there is an environmental volunteer training course within the jurisdiction, will refer to its participation.
(4) The work team selects the warm patrol team with rich culture, landscape and human history, and assists in the production of the story of the two patrol teams. It has already used the kanban to provide warm teams in November.
(5) The working team continues to use the communication or telephone to contact and accompany the Xiding River Guard Team.
(6) Two patrol team education trainings have been handled in the 6/25 False Warm People Activity Center and the 10/26 False Acura District Office; and the patrol team environmental education facilities were completed in the second training session. Watching.
12. River surface cleaning (at least 20 metric tons)
This work team completed 10.79 metric tons of river surface waste disposal this year, with a completion rate of 53.9%.
XIII. Sudden pollution support and treatment in water environment
The team has reported on 6/28 the “Emergency Response Procedure for Dead Fish or Water Body Discoloration in Rivers” and assisted in the completion of the “Emergency Response Procedure for Dead Fish in Rivers in Keelung City” on 9/15.
XIV. Drinking water source water quality protection zone
(1) The raw water quality of the water purification plant is sampled, and the raw water quality is sampled for four water purification sites, including Anle, Johor Bahru, Six Block and Warm, within the jurisdiction. The total implementation is 4 times; the annual target is reached 4 times, and the achievement rate is 100%.
(2) Two drinking water source water quality protection zones in Xinshan and Xi'an Reservoir, and seven water intakes such as Dongshikeng, Weng, Keelung River and Bajiao, Youyi, Malingkeng and Grassland are inspected for a total of 4 times; The annual target was reached 4 times and the achievement rate was 100%.
(3) The water supply company will conduct inspections on two reservoirs, namely, Johor Bahru and Xiji, within the jurisdiction of each quarter, for a total of four times; and achieve an annual target of four times with a completion rate of 100%.
Fifteen, drinking water safety management
(1) Perform water quality sampling of the tap water supply system and sample at least 40 pieces per month.
Sampling work was carried out in the water supply system of the water company, totaling 480 times; reaching 480 annual targets, the achievement rate was 100%.
(2) Execute continuous water supply and fixed equipment, and inspect at least 15 places per month, including at least 10 water quality samples.
For the public and private drinking fountains, 180 inspections and 149 samples were collected; the annual target was 180 and 120, and the achievement rate was 100% and 124%.
(3) The water quality inspection of the clean water outlet of the water purification business of the water supply business shall be carried out at least once a quarter for a total of 4 times; the annual target is reached 4 times, and the achievement rate is 100%.
(4) Sampling and sampling of water wells, mountain springs and other simple tap waters, with a minimum of 36 planned periods. The total execution was 40 times, and the achievement rate was 111%.
(5) Summer drinking water sampling test: During the summer vacation, 269 points of sampling and testing were carried out for the water quality of the school sink (indirect water supply) and the water dispenser (direct water supply), and the achievement rate was 100%.
(6) The water purification treatment of the water purification plant shall be checked at least once a quarter for a total of 4 times; the annual target shall be achieved 4 times, and the achievement rate shall be 100%.
(7) The drinking water industry packaged or inspected shall conduct a check at least once a quarter for a total of 4 times; achieve an annual target of 4 times with a completion rate of 100%.
(8) Control of drinking water sampling after disasters. There were no major disaster events this year and it was not implemented.
XVI. Marine pollution drills and professional training
(1) Marine pollution emergency response drill 1 time
This work held two consultations on 7/27 and 8/14, two rehearsals in 8/21 and 8/23, and mobilized 12 units in the 8/24 fake Waimushan fishing port, with a total of 80 participants. The rest of the people handled the emergency response drill for the marine oil pollution incident and was a complete success.
(2) Marine pollution emergency response equipment equipment inventory and maintenance operations 2 times
In 3/22 and 10/16, cooperate with the North District Joint Defense to carry out maintenance work on marine equipment for the warm container house, and strengthen the implementation of equipment maintenance work on 6/25 and 10/18 for the opinions of the North District.
(III) Marine pollution emergency response drills Equipment and consumable parts replacement operations: completed in November.
(IV) Marine pollution professional training 1 time: A marine pollution professional training has been held in the 8/10 Fake Keelung Fisheries Association to enhance the professional quality of marine pollution emergency response team members.
(5) Purchase of river type oil retaining cable: completed on 6/28.
XVII. Handling marine pollution inspection and control operations
(1) Execution of ship inspection and control operations (including: 50 merchant ships and 31 fishing vessels) with a completion rate of 100 and 103%.
(2) Perform at least 150 inspections of port inspection and control, with a completion rate of 100%.
XVIII. Implementation of pollution source inspection and control operations: Conducting a pollution source inspection and control work for each of the listed power stations (4/26) and CNPC (10/24) in the jurisdiction, and the results of the inspection are in compliance with the laws and regulations.
19. Update the map of marine oil pollution equipment and the information of the EPD system. The work of updating and mapping the risk map of marine oil pollution in Keelung and the map of updating and mapping the marine emergency response equipment have been completed.
20. Promote the promotion of a green port environment
(1) In the course of handling the ship inspection operation, the waste oil and sewage generated by the ship shall be entrusted to the qualified agent to be cleaned up, and the application materials of the "Business Waste Declaration and Management Information System" shall be checked.
(II) This work was conducted on June 28th in the meeting room of the Fisheries Club of Keelung District for a marine environmental education training.
Twenty-one, the implementation of water quality testing in the port area: for the sea area of the east coast of Keelung Port and the sea area of the Bayouzi fishing port, the sampling area is completed once every season; the annual target is 8 points, and the achievement rate is 100%.
廿一, Submarine (drift) garbage removal and marine environmental education
(1) Conducting near-shore seabed (drift) garbage investigation and removal: This work entrusts a private diving team to perform nearshore shores on the 9/7, 9/8 and 9/21 to 9/23 false Waimu coastal scenic spots. The garbage inspection operation has carried out five activities of 104 people. The total weight of the garbage collected is 248.8 kg, of which plastic fishing nets account for up to 200 kg, accounting for 89.4%.
(2) Marine environmental education promotion activities include: 4/28 Spring Beach, 6/9 World Ocean Day Net Beach, 6/17 Swimming Activity Beach, 8/4 Environmental Volunteer Group and 9/15 World Clean Day Jinqiujingtan and other activities.
(3) The results report was sent to the paper report and 10 related electronic files in November.
(4) Except for the first quarter, the environmental protection fleet did not hold any work, and the other three seasons reported the results according to the regulations and uploaded them to the system.
(5) Wenxuan products (1,000 copies) and exchange products (1,300 copies) were sent to the Environmental Protection Bureau for reference in November.
廿 Second, other administrative assistance matters
(1) Handling 20 water conservation activities, and completing 24 games this year, with a total of more than 500 students.