To the central content area

Chiayi City Yisan pollution source inspection control plan

Absrtact
The sources of fugitive particulate emissions in Chiayi city come mostly from constructions. Additionally, the inconvenience, noise, pollution, etc. that constructions cause are most commonly complained by civilians. Besides supervising constructors through inspection process to execute pollution prevention, this year we elevate quality of control by ten friendly measures such as beautifying of fence, greening bare land and road-adoption are taken this year, to make the practitioners not only conduct prevention of main construction body, but also add environment beautifying and good-neighborliness, to promote citizens’ right of good living environment. In governance of air pollution from construction, as per the project 2242 inspections of construction sites have been implemented.72 percent of the inspections comply with the Regulations of Management Measures and 91.23 percent of those comply with the Management Measures for Level-1 and Level-2 Construction Sites. The TSP production is 442.035 tons; the TSP reduction is 258.73 tons with the reduction rate 58.53 percent. The following are other implemented tasks: a construction site and noise pollution prevention propaganda meeting is held twice, advancing road-adoption up to 8202.94 kilo-meter including 22 places is promoted, 58 fences are beautified and greening 31.314 hectares of bare construction sites, 51.95 tons of environmental protection oil paint and 472.385 tons of environmental protection building materials are used, 10 CCTVs are set, and 25 places are pasted with road-adoption lines. In statistics of noise of construction site, there are 304 initiative inspection cases of construction site noise, reaching 100% of the work target (304/300), wherein the average inspection frequency is 1.1 times, and there are 276 places in control after inspection. There are 243 places with related measures of sound insulation, 77 places with vibration isolation and 191 places with positive action of noise reduction. So far, the plan has accepted and heard 72 cases of construction site noise.
Keyword
Construction Site, Control Strategies for the Fugitive Particulate Source, Public Nuisance Dispute, Construction Noise, Noise Control
Open
top