To the central content area

108 Taitung County Construction Project Pollution Control Plan

Absrtact
(I) Carrying out pollution control operations such as collection of air pollution charges and inspection (patrol) inspections of construction projects: 1. In accordance with the "Measures for Air Pollution Prevention and Control Charges for Construction Projects" announced by the Environmental Protection Department of the Executive Yuan, assist the authorities in handling the declaration, collection, collection, settlement and refund of air pollution control charges for construction projects, and Provide legal interpretation and other operations on the doubts of each case. 2. Assist the authorities to strengthen inspections on construction sites that have not declared air pollution control fees before the start of construction, and counsel construction owners to complete the declaration. 3. Monthly inspections have been completed to settle the project, and the collection rate of implementing the air pollution prevention fee reminder payment operation reached 100%. 4. Perform at least 170 inspections (patrols) of the construction site every month (including case reports). The inspection volume in February 109 may be reduced according to the proportion of working days, and shall be reported to the authority in writing before May 31, 108. Allocate the reduction of inspections to other months for implementation.), Holiday inspections (patrols) should be conducted at least 10 times every half month; and for the top 25 construction sites in the previous month, the monthly inspections (patterns) should be checked at least once, The remaining first-level construction projects in Taitung County should be inspected (patrolled) at least once every one month, and the second-level projects should be audited (patrolled) at least once every three months. (Lvdao and Lanyu) inspections shall be conducted at least once every 6 months. (Each inspection (patrol) inspection record must be signed by the site staff. If no one on the site has to record the telephone contact object, number and time; for each check item and missing items, you must take pictures for inspection, and attach the photos to the inspection ( In the inspection records, if there are any cases that are missing and cannot be signed by the site construction personnel, the construction owner should be notified by phone on the same day and filed with the authorities, while the inspection (patrol) records will be used to explain the reasons and to document the details). 5. The manufacturer shall inspect the construction sites with ten points (inclusive) for missing inspections (patrols) every week, and shall review the construction site together with the staff of the agency. The construction site shall report that the improvement completion rate shall reach 90%. (The statistical analysis and performance standards for the implementation of the preceding item are based on the specifications and assessment methods announced by the Environmental Protection Department of the Executive Yuan.)  (2) Dealing with construction training and publicity instructions: 1. At least 2 sessions of education and training related to this plan (at least 2 hours per session). 2. According to the project type, pollution situation, and specific area control test, conduct 2 construction project introduction briefing sessions, the time interval between the two applications should not be less than 4 months, the invitee should include public and private sector construction owners and often missing manufacturers , The number of participating manufacturers at least 15 each time (30 days before the briefing meeting to send a letter to the agency, and with the consent of the agency to handle). 3. Depending on the target (people, construction owners and contractors, or related associations), when submitting air pollution charges, advocacy activities, or inspections (patrols), the air pollution control of construction projects printed by the authorities, related laws and regulations, and air pollution Publicity leaflets, brochures, and publicity posters for publicity and payment of pollution fees, and planners should be submitted to the agency within 30 days from the date of signing, and 450 leaflets and brochures will be printed and 100 posters will be approved by the agency. Servings, for a total of 1,000. (3) Handling the filing of relevant information on the construction site: 1. Maintain and update the "A2010 Construction Site Pollution Control and Charge Management Information System" issued by the Environmental Protection Agency. Enter basic computer data, audits, arbitrations, rectifications, improvement situations, and related information into the computer database for the construction site. Submit an updated electronic file every Monday. 2. Regularly estimate the fugitive emissions and reductions at each site in the database, and upload the data in accordance with the deadline set by the Environmental Protection Agency. 3. Execute the quality assurance (QA) / Quality control (QC) check function of the air pollution control database system of the construction project, and periodically debug and modify the file. The quality of the data file should be 100% to meet the accuracy of the EPA's spot check.  (4) Checking the pollution prevention facilities at the construction site: 1. If the inspection fails, the construction site shall be instructed to improve the compliance with the statute standard; if the applicant is eligible for the replacement scheme, the construction site shall be instructed to submit an application for the alternative scheme, and the machine shall be assisted to complete the replacement within 10 days of receiving the application from the owner for the alternative scheme. The written review and on-site investigation review of the application for control measures shall be sent to the authorities for review. 2. Before the end of the plan, promote at least 10 fence greening (or fence painting) or achieve the goal of adopting at least 10 public and private places to adopt the surrounding roads and the length of the roads to be accumulated over 5,000 kilometers.  (5) Noise control operations at construction sites: 1. For the measurement of construction machinery and noise cases on the construction site, upon notification by the agency, the designated person in charge of the plan with a certificate of "public or private location noise inspection or appraisal personnel" shall perform an active inspection and measurement with the staff of the agency, And in accordance with the "Noise Control Law" and "Methods for Measuring Sound Power of Construction Machinery for Construction" formulated by the Environmental Protection Department of the Executive Yuan. 2. Assist the authorities to handle amendments to Articles 8 and 9 of the Noise Control Law and complete the announcement.    (6) For aviation noise control operations: 1. Relevant units and personnel (such as experts and scholars) are invited to review the aviation noise monitoring report of the Air Force's Seventh Flight Training Wing (Zhihang Base) and the Civil Aviation Bureau of the Ministry of Transportation Taitung Air Station (Fengnian Airport) on a quarterly basis. Send the review opinions to the authorities for investigation within 10 days after being notified by the authorities. 2. Conduct more than one site noise monitoring site inspection each year (submit the planning document 30 days before the application to the authority for approval), invite relevant units and personnel (such as experts and scholars) to attend, and formulate the "enforcement of aviation noise monitoring" according to the Environmental Protection Agency Stations, Monitoring Centers and Guidelines for Review of Aviation Noise Monitoring Reports Around the Airport "for verification, and the results will be sent to the authorities for inspection within 15 days after the on-site verification. (7) Cooperate with the relevant control and assessment operations of the Environmental Protection Department of the Executive Yuan: 1. In accordance with the organization's air quality management (AQMP) plan, submit various assessment reports for the previous month before the 5th of each month, and submit quarterly assessment reports and calculate pollutant reductions before the 10th of the end of each quarter. 2. In accordance with the various assessment requirements for the emission source and noise set by the Environmental Protection Agency of the Executive Yuan in the 108th year, and submit the assessment report, assessment results report, data collection and reporting in accordance with the deadline set by the agency, achieve the environmental protection of the Executive Yuan. The Agency supervises the work items designated or cooperated with this plan. 3. Cooperate with the research and development of the county's air pollution prevention plan. 4. Before the plan is closed, the manufacturer shall fill in and upload the final report and related results data according to the website designated by the Environmental Protection Department of the Executive Yuan. After the approval of the agency, the final payment can be requested.  (Eight) other: 1. Various reports shall be submitted to the authorities for review in accordance with the contractual provisions or the deadlines notified by the authorities. 2. Cooperate with agencies to implement related work to implement energy conservation and carbon reduction policies. 3. Collect the best practices of pollution control strategies for related construction projects in other counties and cities, and integrate them according to the characteristics of the county, and provide authorities on a quarterly basis as a reference for improving the plan contract. 4. Summarize the independent pollution management practices of construction sites in other counties and cities, and consider the characteristics of the county, and plan the standard operating procedures for independent management of pollution at construction sites to help improve the implementation of this plan. 5. Vendors assigned to the project are responsible for the project (except for personnel reporting to the police report center and county citizen service center) to wear uniform clothing (summer and winter uniforms, coats, audit vests and hats) during working hours to facilitate identification (clothing must be signed The production is completed within 30 days from the date, and the new staff is also completed within 30 days from the date of employment during the performance period. Employees shall be prohibited from wearing slippers and smoking, drinking, and betel nut while the work is in progress to improve work discipline and overall Image. 6. Within 60 days from the start date of the plan's performance, the manufacturer shall provide general health checkups to the dispatched laborers sent to the agency to provide labor services. The inspection items and contents shall be handled in accordance with the provisions of the labor health protection rules. 7. When the staff performs the work, or if they have any questions, inquiries and related business related to the plan, they should not push forward, deal with them politely, and explain, reply and deal with related business. 8. The vendor's service proposal cum selection review amendments to additional or supplementary or commitment matters.   (1) Assisting agencies at the end of 108 to reach the 108 assessment targets of the Environmental Protection Agency of the Executive Yuan.   (2) The results of each quarter's key work have reached the goals set out in the schedule for implementation of the plan.  (3) assisting the agency to set goals that meet the 109 performance evaluation of the Environmental Protection Agency of the Executive Yuan, and     Completed presentation of performance presentation.  (4) Investigate air pollution prevention strategies or actions or ideas with local characteristics of Taitung.   (5) Search and compile the latest amendments and regulations related to the business of this project and collect them into a book.
Keyword
108 Taitung County Construction Project Pollution Control Plan
Open
top