To the central content area

2019 Taichung Mobile Pollution Sources Control and Exhaust Inspection Station Quality Management Plan

Absrtact
Project objectives for 2019, in Taichung City area motorcycles regular inspection of propaganda and control, to achieve the public understanding the motorcycles regular inspection of relevant policies, further effective control of emissions from mobile sources, and improvement maintenance of air quality. The schedule of this project from January 15, 2019 to December, 31, 2019, all items were reached to 97.0 present targets. In sifted operations of un-finishing periodic inspection motorcycles, a total of 388,128 pieces of un-finishing periodic inspection motorcycles official notices were sent. 2,347 motorcycles were blocked and were conducted random roadside inspections, a total of 189 motorcycles did not pass the inspection, re-inspection after notice were reach 92.1%. In the tasks of outdoor inspection, this project completed 9 outdoor inspections for remote areas, in which 706 motorcycles participated. In high-polluting vehicles control, a total of 836 of squid car report case, 18 conference sessions case reviews of squid car sighting reports, 13 reward prizes given out to the sighting reporters, 105 squid vehicle cases penalize, penalty to 83 unpaid fine cases and other administrative procedures. A total of 42 sessions case to those high-polluting vehicles to the designated place to complete the squid car green white smoke check. In motorcycles exhaust inspection check station equipment and environment quality, there was 427 times check on the station equipment and environment quality, 427 of standard gas specimen collecting samples cross matching result comparison. In result, the reductions of air pollutants were 22.3 tons of NOx, 7.6 tons of PM10, 5.7 tons of PM2.5, 130.2 tons of NMHC and 347.2 tons of CO.
Keyword
Motorcycle, Emission Inspection Station, vehicle emission
Open
top