Summary
The implementation of the plan focuses on assisting the Environmental Protection Bureau in promoting the inspection and control of water pollution sources and water quality monitoring in the area under its jurisdiction, ensuring the current situation of water pollution prevention and control in the area under its jurisdiction, supervising and urging the institutions under its jurisdiction to implement the operation and maintenance of water pollution prevention and control facilities, and achieving the goal of improving the water quality of each basin station under its jurisdiction. The summary of the results of the interim report from January 1, 2019 to October 31, 2019 is as follows:
1.Examination of water pollution control permit and establishment of database
(1) The total number of reviews was 327 (703), and the average number of days for licensing review was 6.9 days.
(2) There are 878 related operations of the pollution source system, including 628 audit records, 239 permit application cases (discharge permit, water pollution prevention and control measures plan, construction site runoff wastewater reduction plan), and 11 other disciplinary cases.
2. Assist in the inspection of water pollution source train management
(1) As of October 31, 2019, 593 times of water pollution source inspections were carried out, including 589 times of listed management enterprises within the definition of Water Pollution Control Act , and the annual target value of 100% has been achieved.
(2) Apart from the construction site, 127 animal husbandry inspections were conducted for the most times, accounting for 21.6% of the total inspections, followed by 64 inspections in industrial areas (excluding scientific industrial parks) other than petrochemical professional areas, 41 inspections in food manufacturing and 36 inspections in various sewer systems.
(3) In terms of management and business inspection, 179 inspections were conducted in Xincheng River Basin, 119 in dezikou River Basin, and 97 in Dongshan River Basin, accounting for 67% of the total.
(4) There are 61 water pollution source management institutions (including 21 construction sites) in dekouxi key measuring station. During the planning period, there are 46 inspections, 62 inspections have been carried out, and the control rate of the key measuring station is 75%.
(5) There are 23 penalties for violation of the relevant provisions of the Water Pollution Control Act in the inspection of water pollution sources. The total fine is TWD 6,466,250 dollars, and the punishment rate is 3.9%.
3. Function evaluation and guidance on proper operation of wastewater treatment facilities
(1) For public and private places with room for improvement of wastewater treatment facilities in 2019, three primary assessment, unit facility sampling, reassessment and consultation of water pollution source and wastewater treatment equipment function assessment have been completed.
(2) There were 15 functional assessment enterprises in the period from 2014 to 2018. After deducting two enterprises that were shut down by the tribunal due to serious circumstances and one enterprise whose wastewater discharge license was revoked, there were 12 enterprises that should be rechecked in the year of 2019. By the end of October of 108, there were 12 enterprises that had completed the recheck, and the progress of the recheck was 100%.
(3) The waste water treatment facilities shall be properly operated for guidance. At the end of the period, 8 guidance institutions shall complete the audit work. If there is any defect after the current survey by the guidance group, the improvement time shall be limited and follow-up review work shall be arranged. The results showed that the waste water treatment facilities and equipment of two restaurants and sightseeing hotels (restaurants) in remote mountainous areas were in disrepair, the dissolved oxygen in the aeration tank was on the high side, and the water flow direction was inconsistent with the permit; the other six animal husbandry had problems such as excess sludge in the sedimentation tank, floatation and scum in the overflow weir, etc., and it was suggested to strengthen the sludge discharge and removal of the bottom sludge, which were improved after the review and tracking, but still had problems. In order to maintain the function of wastewater treatment equipment, operation and maintenance shall be carried out continuously and sludge shall be returned regularly.
4. Assist in the operation of water quality and quantity automatic monitoring and video recording monitoring system
(1) In the year of 2019, 9 enterprises have connected to various water quality and water quality monitoring projects. Besides the Letzer Industrial Park sewage treatment plant and TAIWAN SEMICONDUCTOR CO., LTD Letzer factory, the monthly effective monitoring record percentage of the other 7 projects that should be connected to reach more than 90%.
(2) Five automatic monitoring facilities for monitoring suspended solids and chemical oxygen demand are required to monitor the percentage of effective monitoring record value in the quarter. It is found that the percentage of effective monitoring record value in the second quarter (65.7%) and the third quarter (51.5%) of COD project in Letzer sewage plant is less than 80%. The main reason is that Letzer Industrial Park sewage treatment plant handles the change of automatic monitoring facility measures statement and confirmation report due to the failure of the above cod automatic monitoring equipment Application, resulting in poor upload rate. From the first quarter to the third quarter, the average SS and COD projects of the other four enterprises reached more than 80% each quarter, of which the suspended solids were between 97.7% and 100%, and the biochemical oxygen demand was between 98.1% and 100%.
5. Regular water quality monitoring
(1) The total number of river water quality sampling and testing is 52 points in 22 stations.
(2) The water quality of five lakes was monitored and sampled 15 times.
6. Watershed control of key stations
In view of the fact that the key stations in Yilan County have not participated in the inspection of animal husbandry (including the inspection and removal of concealed pipe and bypass discharge), the total number should be at least 35 times. At the end of the period, 21 companies and 40 companies have been audited and tutored, and the progress of the inspection is 100%. The on-site inspection of waste water treatment facilities are normal operation, and there is no illegal act.
7. Assist in collecting water pollution prevention and control fees
(1) In the second period of 2018 (the collection range is from July to December of 2018), 208 objects should be declared by the end of January of 2019, with a declaration rate of 100%. The total receivable amount of water pollution prevention fee is TWD 5,226,579 dollars. In the first phase of the year 108 (the collection range is from January to June of the year 2019), 217 water pollution prevention and control fee businesses should be declared in total. As of October 31, 217 have been declared, with the proportion of declaration completed being 100%, and the total amount receivable being TWD 4,415,317 dollars.
(2) By the end of October, 13 enterprises designated by the environmental protection department to audit water and sewage fee management and 20 enterprises selected by itself had been audited, with a 100% audit achievement rate (33 / 30).
8. Promoting the use of livestock manure, urine, biogas residue and biogas liquid as agricultural fertiLetzerr
(1) The application of biogas slurry and biogas residue as farmland fertiLetzerr has been handled twice on March 28, 2019 and April 15, 2019.
(2) There were 10 mentors for the biogas residue and biogas slurry plan of animal husbandry in 2019. By the end of October, 2019, the "biogas residue and biogas slurry as farmland fertiLetzerr utilization plan" had been approved by 5 companies. One company supplemented the central part of the plan, and conducted three tests for biogas slurry composition, soil texture and groundwater background.
(3) One (Lin ○ Kun) livestock farm has completed the application for guidance, which is in line with the standard water resource utilization of drainage water. The resource-based proportion of the farm is 31%. Another one is in the process of application for permission change.
(4) 28 small-scale animal husbandry enterprises have been assisted to apply for wastewater management plan, 17 of which have applied and 14 have completed the examination and preparation.
9. Assist in water environment related work
(1) As of October, three new teams (tieniuliaka, jincaoshui and wuweigang water environment patrol team) and 68 volunteer friends have been added. At present, there are a total of 215 river water environment patrol team members from 16 teams, who are responsible for the patrol of various reaches of Yilan County.
(2) Collect the results of water environment inspection and water purification, among which 17 times of pollution notifications (including old bamboo rafts, scrap iron sheets, waste from drainage gates and duckweeds, dead chickens, discarded domestic waste from river channels, scrap lamps, oil pollution and peculiar smell, etc.) have been reported to the inspection office or relevant units to assist in the improvement. Among them, 2047 inspections were carried out, the number of cleaning places reached 1992, 155 river bank cleaning activities and 3 coastal beach cleaning activities were carried out, the amount of garbage removal was 20,194.74 kg, and the amount of resource recovery was 43,704.34 kg; 219 river water quality (water temperature, pH, do, turbidity) monitoring were carried out with simple water quality detection package, and 79 education and training were carried out, with 1133 participants.
(3) Assist in the exchange of water environment patrol team and the flag awarding activities of tieniuli aka patrol team, the activities of zhenjingxi in the 16th part of Luodong Town, the propaganda and guidance for the use of biogas residue and biogas liquid irrigation, and the activities of the propaganda and guidance meeting for the year-end review of water environment patrol team.
(4) 252 dirty and disordered spots in the river have been inspected and reported. The highest proportion of general garbage is 80.2%, followed by aquatic plants (such as water lilies, duckweeds and weeds) blocking the river 16.3%. The highest percentage was 88.1% in water resources department, followed by Farmland Water Conservancy Association (10.7%), Jiaoxi Township Office (0.8%), the first River Bureau (0.4%). It is estimated that the total waste area is about 258.3 square meters and the total weight is about 3,366 kg.
(5) Assist to collect and confirm the number of flies in the planting area of the upper reaches of Lanyang River, and assist to implement 12 times and 108 points in 2019 years.
(6) Assist the Environmental Protection Bureau in the sampling work for the inspection of tap water and non tap water quality, and cooperate with the sampling work according to the manpower demand of the Environmental Protection Bureau. As of October of 2019, it has assisted in the implementation of sampling for 142 times in 18 working days.
10. Propaganda and education
(1) Provide, maintain and update relevant information on water pollution prevention and control measures every two weeks, and complete A+ level accessibility standard test report (document) every two months.
(2) On July 15, 2019, the first publicity and instruction meeting of water pollution management institutions was held. The theme of the meeting was the explanation of recent amendment of water pollution related laws and regulations, the operation process of regular inspection and declaration, and the explanation of common defects. The number of applicants was 132 and the number of participants was 129. The second session is expected to be held on December 6.
(3) The first professional course lecture training was held on January 30, 2019. The theme of the seminar is to exchange and observe the business of river water environment improvement. Through observing the performance and experience of river water promotion in Taoyuan City, such as water purification facilities in gravel room, water environment education center (environment education place) and artificial wetland, it will be used as the future implementation of water pollution prevention in Yilan County Reference for the direction of governance and research. The first one is expected to be handled on December 9.
(4) On October 6, 2019, the Environmental Protection Bureau cooperated with the large-scale environmental education publicity activities to set up a stall for water environment education publicity, and designed a situational environmental education parent-child game to rescue the water quality spikers. Through the river fish water quality index system, game and questionnaire feedback, the public can quickly study and judge the quality of the river water near their home. A total of 456 people participated in the activity, 343 questionnaires were recovered, 98.5% People can easily judge the degree of water pollution by fish in the water.
(5) On October 18, 2019, we cooperated with the environmental protection bureau to hold a year-end review and propaganda meeting for the water environment watch and help patrol team. 97 volunteers took part in the activity. Besides praising the excellent patrol team of the 6th team in 2019, the leader of linzimiao county also held the flag awarding ceremony for the establishment of the new patrol team of the 2nd team (Jin Cao Cihui water environment patrol team and Wuwei port water environment patrol team). The leader of linzimiao county also welcomed the new team Our volunteer friends joined the river patrol to maintain the water environment. Because of the new members, the water environment patrol team in 2019 reached 16, with 215 members in total.