To the central content area

Program of the 109th year on Inspection and Control of Stationary Pollution Sources in Hualien County

Absrtact
This plan has been officially signed on January 1, 109 and implemented this year. The contract change negotiation was completed on July 9, 109, and the new “discharge pipeline total suspended particulates, suspended particulates, fine suspended particulates, condensable particles, etc. 1 The work items of "Periodic Inspection" and "Monitoring of Hazardous Air Pollutants in Two Seasons a Year". According to statistics as of December 31, 109, the monthly completed quantity and cumulative progress of various tasks have reached contract specifications in accordance with the scheduled progress. This plan requires not only the quantity to be achieved, but also the quality improvement. Therefore, the working group submits monthly results reports for approval by the Environmental Protection Agency every month. For detailed descriptions of the results of each work, please refer to the content of the subsequent chapters. The following is the current year The summary of the results of the project implementation is as follows. The promotion of the fixed pollution source permit system. At present, 87 factories under the management have issued operating permits, a total of 117 operating permits, of which 42 enterprises have discharge scales up to the environmental protection agency’s announcement to declare emissions. This year, the establishment of a fixed pollution source database has been continued. In addition to confirming the current status of on-site pollution control and updating the pollution discharge amount, in addition to confirming the status of on-site pollution control and updating the pollution discharge amount, the database has been updated and expanded and cooperated with the inspection results of the Environmental Protection Agency. 1,707 abnormal fields in the database are corrected every month. In order to maintain the good air quality in Hualien, this plan continues to promote air pollution reduction work. Among the operating permits issued this year, a total of 8 processes have completed pollution emission reduction operations, and a total of 523.9 metric tons of particulate pollutants have been reduced (sub-clay correction) The emission factor recovery permits emissions of 471.1 metric tons), a total of 14.2 metric tons of sulfur oxides, a total of 16.4 metric tons of nitrogen oxides, and 0.2 metric tons of volatile organic compounds. This year, experts and scholars were hired to complete at least 4 license review contracts and specifications of 5 major factories, but only one application was submitted. In the outsourcing review operation, there were at least 8 contract specifications for "setup, change, operation and five major factories" license application cases, and only 3 applications were filed. After performing 110 licenses, 2 of them were inconsistent, with a compliance rate of 99%. The main reasons for the missing were that the amount of raw materials exceeded the license by 10% and the on-site process did not match the license. Perform 220-point inspections, and there are no discrepancies at the work site; and completed the review of 99 inspection plans for 32 factories and 155 inspection reports for 59 factories. In terms of inspection and inspection management operations, a total of 1,210 inspection and inspection records have been filed, including 1,025 inspections and 185 inspections carried out by this plan. The inspection objects are mainly complaints from the public and major pollution sources. Perimeter/discharge pipeline odor sensory detection completed 34 points; oil and coal sulfur content sampling test 26 samples; discharge pipeline dioxin completed 5 times and heavy metals completed 4 times. The sampling results all met the emission standards. In response to inspections and inspection results, a total of 12 punishments were imposed this year, with a total punishment amount of 3.45 million yuan, and the improvement completion rate was 100%. In the third quarter of 109, there are 131 companies that should declare sulfur oxides and nitrogen oxides. The total declared emissions are 1,151 metric tons of SOx emissions and 3,054 metric tons of NOx emissions. The total amount of the two is 32,032,874 yuan; The number of companies that should declare the pollution fee is 209, the total amount of particulate matter declared is 580 metric tons, and the total amount of air pollution fee declaration is NT$22,593,138; the number of companies that should declare the air pollution fee for volatile organic compounds is 120, and the total declared emissions 52.47 metric tons, accounting for 865,667 yuan; 209 companies should declare pollution fees for lead, cadmium, mercury, arsenic, hexavalent chromium, and dioxin, with a total declared emission of 0.181 metric tons, and the total amount collected is NT$67,865. The list of industrial zones has completed the verification of 223 industrial zone laws and regulations, with a verification rate of 96.53%. In-depth inspection operations have been carried out by the Zhonghua Pulp and Asia Cement Plants and other two factories to conduct night inspections. The inspections were conducted by the method of not telling the inspection time of the industry. The inspection contents include on-site inspections, on-site inspections by members, document inspections, night inspections, and unknown gas sampling analysis /MS) and other key tasks. This year, the post-licensing review ratio was strengthened. PM10 reduced 283.36 metric tons, PM2.5 reduced 189.19 metric tons, sulfur oxides reduced 14.2 metric tons, and nitrogen oxides reduced 16.4 metric tons. In addition to completing the work objectives of the contract specifications, this plan also provides follow-up suggestions on the control of Huazhi, cement plants and power plants, and the implementation of the plan based on the results of the annual implementation of various tasks for the EPA as the future Reference for the development of fixed pollution source control strategy and plan content planning.
Keyword
Fixed pollution sources, permit control, air pollution fees, inspections, emissions, boiler replacement
Open
top