To the central content area

2020 Taichung City Construction Project and Road Cleaning Inspection

Absrtact
The infomation collection and analysis have been completed regarding to the construction levying, management, air pollution reduction as well as the results for the period of the final report(from February 01,2020 to November 15, 2020). Based on the proposed governance strategy, the summary of the executions is described as below: 1.Totally 9,126 cases of the Construction project air pollution prevention fee collections have been completed(includes 4,960 cases of the construction start application, 4,166 cases of the construction complete application and 132 cases of constructor change applition). The total amount collected is NTD $156,459,493. The online application rate is 77.51%. 2.11,877 inspections have been conducted within the year. The reduction rate is 61.2%, the admission rate is 74.21% and the compliance rate is 97.63%. 3.10 inspections of the vehcle emission have been conducted, of which 4 vehcles have meet the emission standard. 4.Currently, 10 aerial photography operations were performed over for the regional development projects, including two sites each time. 5.The total length of the road surveying conducted within the year is 5,193.82 km, in which Class A roads take up 83.97%, and Class B roads take up 16.03%.
Keyword
Construction work air pollution fee, Construction site inspection, Construction detection, Street cleaning, miniature sensors
Open
top