To the central content area

Air Quality Comprehensive Management Plan of Hsinchu City in 109

Absrtact
This plan implements 109 Hsinchu City Air Quality Integrated Management Plan related work items and assigned business. According to statistics, as of December 15, 109, the total progress meets the plan goal and reaches 100.0%. It shows the implementation progress of each work item in Table 1. Shown. The relevant important implementation results are: 1. Analyze the implementation effect of air quality improvement in this city This year, according to the plan, it is necessary to summarize the implementation results of air quality improvement in the city. As of the end of November, the city’s AQI value is 54. AQI<50 (good) has 200 station days (59.6%), and it is 100 in June. % Is the highest; AQI>100 (bad) has 19 station days (5.7%), with 20.0% in April as the highest ratio; another in July has 1 station days (3.2%) as AQI index>200 , For the first time in recent years to reach a very unhealthy level. The air pollutant concentration in this city, as of the end of November, the average concentration of PM10 was 26.59μg/m3; the average concentration of PM2.5 (manual) was 13.77μg/m3 (statistics as of November 11); the average concentration of O3 was 32.56ppb; The average concentration of SO2 is 2.11ppb; the average concentration of NO2 is 10.87ppb; the average concentration of CO is 0.32ppm; the average concentration of NMHC is 0.10ppm. 2. Integrate the city’s air pollution prevention and control achievements under the central policy This plan is to grasp the implementation effect of each plan, so monthly document checking is carried out, and the work schedule submitted by each plan every month is used to confirm the implementation status. Statistics this year until the end of November, it carries 11 documents out The overall performance of each project is grade A~B. 3. Pollution control countermeasures research and development This year, it constructed the pollution source emission map based on the fixed pollution sources, construction sites, and petitions listed in the jurisdiction. According to relevant statistics, it was found that the major pollution sources were located in the Science Park, the North District or the East District. This year, in cooperation with the Environmental Protection Agency’s Air Pollution Prevention and Control Plan, the “109~112 Air Pollution Prevention and Control Plan” was compiled based on the city’s current state of environmental pollution, and its pollution emissions were revised on a rolling basis under the drafting guidelines proposed by the Environmental Protection Agency. , And calculation of reduction. The city has also proposed 8 pollution source control strategies and 5 leading innovations to facilitate the implementation of the city’s air quality maintenance plan. Taken part in 3 discussions on air quality improvement and maintenance meetings in the bamboo and bamboo seedling empty area on March 30, June 12 and December 4 this year, and the city hosted the 3rd bamboo and bamboo seedling empty area on September 18 Air quality improvement maintenance meeting. In response to poor air quality and serious deterioration, the contact person of the relevant bureau will be updated this year, and when the air quality is bad, the LINE group and E-mail will be used for municipal units, public and private places, and air noise department related plans to release relevant information. , And upload the reported data to the EPD’s empty product failure response system. 4. Handle the planning work and work review meeting of the Environmental Pollution Prevention and Control Fund Committee This year, according to the content of the plan, the Environmental Protection Bureau shall assist the Environmental Pollution Fund to handle the planning work and the monthly work review meeting. As of December 15, it has assisted in 11 air pollution control plan review meetings and 1 review meeting. The effectiveness review meeting of the session. As of the end of November, this plan will upload monthly and quarterly reports of the EPA’s assessment to the EPA’s assessment system for reference before the 8th and January, April, July and October of each month. This year, the first interim meeting of the Environmental Pollution Prevention and Control Fund Committee, the 1st Environmental Pollution Prevention Fund Committee and the 2nd Environmental Pollution Prevention Fund Committee were held on February 19, May 21, and October 27, respectively. . On May 6 and September 22, two expert/scholar surveys will be conducted in conjunction with the fixed plan and the diesel vehicle plan, and experts and scholars will be invited to make suggestions for improvement. 5. Promote the adoption and promotion of the city’s air quality purification zone This year, according to the content of the plan, at least two on-site surveys of the air purification area must be carried out, as well as matters related to the picking and replanting of withered seedlings in the Qianjia air purification area. This year, two on-site inspections of the empty product purification zone were carried out on March 30 and September 2. During the first site survey, it was found that the cover of the compost bin in the Yugang Environmental Protection Park had fallen, and repairs have been carried out; 35 plants withered in the Qianjia Empty Purification Zone, which were sold by World Advanced Integrated Circuits Co., Ltd. on July 17 The staff of the company and the director of Qianjiali led Zhilimin and Guhe Agricultural Technology Co., Ltd. to replant. This year, according to the content of the plan, more than one carbon sink update survey in the city’s air purification zone must be carried out, and the tree species and trees must be investigated, located, numbered and recorded to calculate the carbon content of the entire tree and the annual carbon growth And upload it to the EPA system. In the first half of the year, the project has completed the carbon sequestration survey of 500 trees in the coastal bike lane survey. Casuarina is the largest one with a total of 135 beads, followed by mangosteen (113 beads), and the third is the eggplant (79 beads). ), calculated by a precise formula, the results of this carbon sink survey show that the carbon dioxide sequestration is 327.56 metric tons, and the overall carbon content is about 89.3 metric tons. This year, according to the content of the plan, at least 6 publicity activities related to air quality control or air quality purification areas must be handled, which should include 1 meeting with the community, enterprise adoption unit or school students to clean up the air purification area or handle air quality improvement related activities Press conference for results announcement. According to statistics, as of the end of December, a total of 5 publicity activities were conducted this year, and 1 cleanup operation of the empty purification area was organized. The employees of the adopting units in the empty purification area were mainly invited to participate in this activity. This year, according to the content of the plan, an air quality purification zone sketching competition or other contests that are helpful for promotion must be held. On October 17th, the air purification zone walk activity-Hsinchu Clean Air and Lohas Tour will be organized, and people in the jurisdiction will be invited And the adoption unit participated in the grand event. This year, according to the content of the plan, it is necessary to assist the Environmental Protection Agency to handle the promotion of the air purification zone, and to submit an application for the establishment of a clean air green wall in the unit under its jurisdiction. In the first half of fiscal year 109, we assisted in the promotion of the six air purification zones in the jurisdiction, which were all adopted by the parks and enterprises within the jurisdiction, and dispatched staff to clean up the air purification zones every quarter. At the same time, it also assisted the three schools in the jurisdiction to submit applications for clean air green walls to the Environmental Protection Agency, all of which have been approved. Currently, Nanhua Junior High, Xiangshan Senior High and Sanmin Junior High have completed the installation work. 6. Assist the Environmental Protection Agency to perform air quality monitoring and improvement and maintenance related businesses In this year, according to the content of the plan, it is necessary to assist the Environmental Protection Agency to handle the collection and lofting operations of 3 manual measurement stations within its jurisdiction and the single-point calibration of the monitoring equipment in the station, the quarterly multi-point calibration, and the school delivery, maintenance and other related operations. In the second quarter, the Dongmen Elementary School will conduct a monitoring (inspection) of hazardous pollutants in the environment, and conduct a monthly survey of the degree of pollution on the city’s roads. As of December 15th, this project has executed 12 times of retracting and stakeout operations, 12 times of single-point calibration and 4 times of multi-point calibration, and will be sent to school on February 20th. In addition, on February 4-7 and May 4-7, the monitoring (inspection) of environmental air pollutants and air pollutants in the first and second quarters of this year will be carried out respectively. As of December 15th, this plan has carried out 12 general surveys of the degree of pollution on the city’s roads to inspect the road environment. The results of the general survey found that most of the city’s roads are Class B roads, and the traffic flow survey is to understand the use of vehicles on the city’s key roads. According to the situation, it is known that Zhongzheng Road has the largest traffic volume, and all road sections are dominated by passenger cars and locomotives. 7. Other matters related to air quality management This year, based on the content of the plan, a total of 65 sets of empty flags (Kandong flags and pennants) must be produced, and 3 air pollution health lectures with at least 120 people in each session, as well as the purchase of promotional materials, the update of the plan’s webpage, and the provision of Send relevant news topics. According to statistics, as of December 15, this year, the school empty flag was produced and the acceptance was completed on March 24. On July 29th, July 30th and August 3rd, 3 air pollution health seminars were held in Kangleli, Xiangshanli and Wugongli respectively. This year, doctors from the Hsinchu City Doctors Union were invited to serve as lecturers. There were a total of 440 participants in the three sessions. Limin enthusiastically participated in this event. At the same time, it has cooperated with the bureau to purchase promotional products and cooperate with the production of towels for walking activities in the empty purification zone. As of December 15th, this project has updated the web page information 12 times, and issued three press releases on April 13, June 18, and October 7 respectively. At the same time, it also assisted the sub-projects to update their web pages on a monthly basis. Information and news issues.
Keyword
air quality
Open
top