To the central content area

109 Hualien County Construction Project and Noise Audit Control Plan

Absrtact
According to the contract specification work items and content, in accordance with the requirements of your bureau, complete the required work items and submit work results reports within 109 years, and submit the last month's execution results reports at the beginning of each month, and the construction sites of 109 years have completed the execution of each operation A total of 34 consents for the independent management of construction sites (16 newly added in the year). In terms of road maintenance, the total length of cleaning and sweeping of 34 (16 newly added in the year) is 28,308 kilometers, and 2,446 inspections and inspections of construction projects have been completed. , Air pollution fee collection and audit (collection/collection number of audits) totaled 2,533, and the number of audits reached 129. The results of the remaining tasks are explained in order as follows: (1) Inspection and control operations A total of 2,446 site pollution control inspections were completed in 109, of which a total of 2,123 times of 0 missing points accounted for 87%, a total of 197 times of missing points below 10 points accounted for 8%, and 126 times of serious missing points above 10 points accounted for 5%, of which the earthwork in the work area was not covered 10 points of the dust-proof mesh cloth button accounted for 29% at most, followed by the main building not fully covered dust-proof mesh cloth button 4 points accounted for 21%, and the third is that the engineering fence did not cover the whole work area accounted for 15%. A total of 12 cases were reported in 109. The total fines amounted to 800,000 yuan, 11 of which have been improved, and 1 project that has not been improved has not been reviewed within the reporting period. The improvement will be tracked in the follow-up. Of the 86 serious defects in construction sites, 69 construction sites have been improved, and the remaining 17 cases that have not yet been improved will continue to be tracked. Comparing the number of inspections in each month with the inspection targets set at the initial stage of this plan, the cumulative achievement rate has reached 100%. Among them, the number of inspections by towns and cities is Hualien City with the highest pollution load, 744 and Ji'an Township with the largest number of inspections, followed by Xincheng Township (240) and Shoufeng Township (198). In terms of project categories, 1,372 other projects and 363 construction (RC) projects were the main inspection focus. In terms of statistics on the number of audits, there are currently 327 audits, with 125 other projects the most, followed by construction (RC) projects with 94. According to the statistics of the number of audits in each township, Hualien City and Ji'an Township are the main audit focus areas. In order to implement noise control on construction sites, 109 Construction Project carried out 108 active construction site noise inspections and measurements, and conducted noise measurements based on the main construction equipment on the site. There were noise sources such as strange hands, cranes, crushers, and ready-mix trucks. Machine tools, measured Leq and Lmax according to regulations, and found 6 construction sites with excessive sound volume during the construction period. The noise source was caused by pile placement and structural grouting. It was improved by communicating with the industry and within the improvement period. Re-examined again, and there is no over-standard situation. Statistics of the 99 construction site noise measurement results show that the Leq measurement range is between 51.4 and 82.2dB(A), and the Lmax measurement range is between 57.3 and 92.1dB(A). Most of the projects with higher Lmax values ​​focus on excavation and piling operations. (2) Compliance with the first and second level engineering regulations From January 1 to November 30, 109, a total of 4,083 sites were managed. Among the 4,083 sites that were managed by the first to third level construction projects, 1,056 were first-level projects, accounting for 26% of the total number of sites; second-level projects 1,877 sites accounted for 46% of the total construction sites; 1,150 third-level projects accounted for 28% of the total. In terms of regulatory compliance, the first-level regulatory compliance increased from 81% in January 109 to 91% in December, a total increase of 10%, and the second-tier regulatory compliance increased from 91% in January 109 to 92% in December 109 by 1%. Will continue to strengthen control related work. (3) Collection of air pollution prevention and control fees for construction projects In 109, the number of air pollution prevention and control fees collected for construction projects in this county was 2,533, totaling 66,202,056 yuan, of which 26,495,557 yuan was collected for road construction, accounting for 40% of the total collection amount, followed by "other projects" construction The project levied a total of 16,522,110 yuan, accounting for 24% of the total amount. A total of 56.396,716 yuan was collected for air pollution prevention and control fees for construction projects in 108, and the amount collected in 109 increased by 9.8 million and 5,340 yuan over the same period last year. Statistics from 105 to 109 years by category analysis of construction project expropriation. In 2015, the air pollution fee was mainly collected on road projects, while 11 new dredging projects were added in 2016, with a total levy of NT$20,15,066. In 107, other construction projects and dredging projects were the main levy objects. 28,898,961 yuan. In 108, the air pollution fee was levied at a maximum of 20,475,405 yuan in the category of "dredging projects." In 109, the number of construction air pollution fees collected was 1,709 for "other construction projects", which was the largest, and the amount collected was 26,495,557 yuan for road projects. In summary, the main collection objects of the air pollution fee for construction projects in this county are "road projects" and "other projects". From the perspective of the distribution of construction projects expropriated by township, Hualien County’s main construction projects are located in Hualien City, while other townships are located in Ji’an Township, Shoufeng Township and Xincheng Township. In 109, Hualien County had the largest number of applications for refunds due to changes in contract funding, a total of 293 cases, with a total refund of 899,729 yuan; followed by a total of 181 applications for refunds due to shortened construction period, with a total refund of 996,764 yuan . In 109, the number of applications for refunds of construction air pollution fees due to contract expenditure reductions is still the majority. The number of construction air pollution fees refunds due to several factors such as "shortened construction period" has shown a decrease year by year. (4) Air pollution fee auditing for construction projects In 109, the construction project database system calculated that there were 102 construction sites that failed to pay the construction air pollution fee within the deadline. There were 65 other types of projects, the air pollution fee payment amount was NT$596,947, and 12 road projects. , The air pollution fee payment amount is NT$69,651; 8 construction projects (SRC), the air pollution fee payment amount is NT$137,338; 8 pipeline projects, the air pollution fee payment amount is NT$70,000 395 yuan; 7 construction projects (RC), air pollution fee payment amount is NT$16,138; 2 construction (house) projects (demolition), air pollution fee payment amount is NT$4,465, overdue payment of air pollution The total fee amount is NT$894,934. The average monthly construction air pollution fee active payment rate and the completion rate of the call for payment in the following month are 100%. (5) Sampling test of oil products for construction vehicles and machinery A total of 20 sampling tests were completed in 109 years (10 points for oil sulphur content testing and 10 points for aromatic hydrocarbons), and the test result was a normal dredging and beach cultivating project in the port area (2016~2021). The detection value of the sulfur content in engine oil is 20ppmw, which exceeds the legal limit. The construction owner has been asked to submit a statement. (6) Motor vehicle noise control and investigation of non-ionizing radiation sources During the planning period, 57 motor vehicle inspections and inspections (inspections) have been carried out. The police will conduct inspections based on the level of vehicle noise perception. A total of 488 inspections and inspections (inspections) have been carried out. All relevant records of inspection operations have been consolidated. Submit it to the Environmental Protection Agency for follow-up procedures, and unqualified vehicles will be listed as notification objects for inspection. In addition to carrying out inspections (inspections) based on the work items, regular collections are conducted based on the noisy vehicle reporting website and police security project data, to screen out suspicious noisy vehicles that have been submitted, and to assist in the administrative procedures and on-site inspections for notification of arrival During the painting period, a total of 108 motor vehicles and locomotives have been notified and inspected, 34 of which are for roadside inspections and project inspections, 50 for noise vehicle reports, and 16 for science and technology law enforcement equipment. There are 8 cars. This year (109 years), the county's non-ionizing radiation measurement operations should be carried out for more than 50 points, and 50 points have been completed so far during the planning period. (7) Control of the flow of industrial waste According to statistics, in 109, a total of 227 inspections of waste removal and treatment institutions built within the county jurisdiction were in compliance with the regulations. The first quarter of the in-depth inspection of the processing institutions was conducted on March 4, 109, and the second quarter of in-depth inspection was conducted on June 18, 109. , On September 7, 109, the third quarter in-depth inspection was carried out. GPS vehicles under the jurisdiction of the county were inspected (patrol) 30 vehicles per quarter, 36 vehicles were inspected in the first quarter, 38 vehicles were inspected in the second quarter, and 41 vehicles were inspected in the third quarter and 37 vehicles in the fourth quarter. A total of 152 vehicles were inspected in compliance with the operating regulations. The real-time monitoring system for industrial waste removal equipment of the Environmental Protection Department of the Executive Yuan was checked once a week, and a total of 53 checks were conducted in 109 years. All 431 pens met the regulations. A total of 712 cases of waste management factories (fields) and construction sites were checked. For the construction project part of the waste disposal plan, please submit the empty pollution fee counter to the list of newly declared construction sites every week. A total of 3,595 pieces of construction sites were submitted 53 times, 127 new pipes were added, and the waste disposal plan review status ( 122 pieces have been verified, 2 pieces are under review, and 2 pieces are returned), and 81 pieces have been submitted to the delisting judgment form (78 pieces have been verified and 3 pieces are under review). (8) Innovative approach-noise inspection of car mirrors After the plan was approved on February 27, 109, the innovative approach was approved and the system was purchased in March. It is currently used to assist in the inspection of the muffler plug in the exhaust pipe during the inspection of noise vehicles. A total of 8 roadside inspections were carried out. A total of 203 sub-motors and locomotives were intercepted and inspected, of which 14 locomotives were found to have no muffler plug after endoscopic inspection. A document was issued to notify the owner of the vehicle to conduct a return inspection the following month, and to assist the police in reporting improperly modified vehicles 12 times. (9) Other Human and material support: All follow the instructions in the bureau to assist in handling. Temporary tasks: All follow the instructions of the bureau to assist in handling. 9. The completion rate of the plan for the current period: 100%, and the progress control rate: 100%.
Keyword
Construction engineering, air pollution, pollution prevention and control, noise control, non-ionizing radiation, construction waste flow control
Open
top