To the central content area

2020 Kinmen County Fugitive pollution source Control Plan

Absrtact
There were 607 applications declared, and air pollution charges of TWD 20,525,697 were reported. In the settlement of completion, the refund amount was TWD 182,072, and the additional payment was TWD 3,452,759. There were 61 overdue cases and TWD 24,802. The total net income of the related cases after combined calculation was 23,821,186 yuan. There are a total of 1,113 construction sites under construction, and the original PM10 emissions generated by them total 590.48 tons. The plan has completed a total of 3,872 inspections, of which 1,059 are managed (the site management rate is 95.14%). After the control of the plan, the compliance ratio of the management measures was 81.2%, and the PM10 reduction by pollution control was 228.468 tons (the pollution reduction rate was 58.77%). In terms of bare land control, 182 bare grounds were located in the bare grounds inspected by the planners, with a total area of ​​61,426 m2. 31 improvements have been made, and the improvement area is 44,383m2. In the field of open-burning control, a total of 123 open-burnings were inspected. If open-burning was found, we immediately asked for extinguishment and strengthened the publicity of the not-open-burning concept and harm. After conversion, the suppression amount of TSP was 229 kg and The suppression amount is 188 kg. It also handled 7 open-air burning briefing sessions, and 20 publicity red cloth strips were hung on the main traffic roads or in obvious locations in the village to improve visibility and effectiveness.
Keyword
Construction site,control operations of open burning
Open
top