To the central content area

Zhuoshuixi River Dust Monitoring and Advocacy Promotion and Street flushing Plan at Yunlin County in 2020

Absrtact
In 107, the Executive Yuan approved the "action plan for dust prevention, control and improvement of Zhuoshuixi River" of more than 1.1 billion yuan over three years. Distinguishing between the three main axes of "water conservancy", "forestation" and "disaster prevention and response", The Ministry of Water Resources and so on are mainly responsible for the "water conservancy" management work. The agricultural committee and others are responsible for the fundamental work of "forestation". The Environmental Protection Agency and local governments are responsible for early warning, monitoring and "disaster prevention and response" and other symptoms. The governance principles are: subsection regulation, River consolidation, reducing bare land and reducing dust. All units cooperate with each other to improve the efficiency of dust control in Zhuoshuixi River. According to the "action plan for dust control and improvement of Zhuoshuixi River. 106 is the base year, and the river dust event day is 59 days. Under the joint governance of the central and local governments. The dust incident in 109 only happened 9 days. Only 1 day occurred in the first half of 110 years. The bare land area decreased from 1500 hectares in 106 to 927 hectares in 109. Improved area reached 573 hectares. Besides.The PM10 of Mailiao and Lunbei stations decreased by an average of 15 μg/m3 and 21 μg/m3 compared with 107 years. PM10 concentration of Mailiao station in 109 did not exceed 255 hours μ g/m3. Lunbei station was affected by strong local wind speed and farmers' tillage on December 30. The hourly concentration appears μg/m3 high value. The rest of the strain-related quantitative results all show that the dust in the Zhuoshuixi River has been improved. The final report period of the plan is 12 months from July 6, 109 to July 5, 110, All planned work items have been completed and comply with contract requirements. The planned work completed items are described below. (1) Update air quality monitoring data and hydrological data and compare historical data. (2) The number of on-site inspections reached 187. (3) Air camera spot shooting job 6 times. (4) Purchase 6 bare maps along the Bank of Zhuoshuixi River and distinguish the potential location of river dust. (5) Review the operation of the standard operating procedure mechanism for early warning and notification of dust from Zhuoshuixi River. (6) Implementation of notification of dust emission from zhuoshuixi River (7) Daily analysis of Zhuoshuixi River dust event (8) Build and update the platform of dust warning and notification system for Zhuoshuixi River. (9) Construction of API system development and open website for the database of zhuoshuixi River dust monitoring station. (10) Zhuoshuixi River dust protection drill operation 1 time. (11) Suspended particulates (PM10) continuous monitoring operations for a total of 397 days. (12) Continuous monitoring of fine suspended particles (PM2.5) for 197 days. (13) A total of 188 on-line dust cameras were installed along the Zhuoshuixi River. (14) River dust prevention business contact meeting 2 times. (15) Set up a river dust patrol team. (16) River dust patrol team advocacy note will be a total of 36 people. (17) Handle 1 meeting of Zhuoshuixi River Dust Communication and Coordination Meeting. (18) The total number of people who improved the demonstration observation and description meeting in the river bare land reached 77. (19) The total number of people handling two training sessions of river dust emergency education for village head (or village director) reached 45. (20) In the village, there were 4 "river dust self-protection publicity and instruction meetings", with a total number of 244 people .(21) 2 times of self-protection and advocacy lectures on river dust on campus, with a total number of 125 people. (22) Cable TV station carried out marquee advocacy for 20 days. (23) Maintain 8 electronic panels for air quality display (24) Environmental cleaning and street washing operations total 18,145.8 kilometers. (25) A total of 1,621.6 km of fog gun dedusting operation on embankment road. (26) A total of 2,137.2 kilometers of road survey graded operations.
Keyword
Zhuoshuixi River, Particulate Matter, Air Pollutants
Open
top