To the central content area

Program of the 110th year on Inspection and Control of Stationary Pollution Sources in Hualien County

Absrtact
The number of monthly completions and cumulative progress of each work of this plan this year are in accordance with the scheduled progress to reach the contract specifications. This plan requires not only to be achieved in terms of quantity, but also to be improved in quality. Therefore, the working group submits monthly results reports to the Environmental Protection Bureau for approval. For detailed results of each work, please refer to the following chapters. A summary of the results of the project implementation is as follows: With the promotion of the stationary pollution source licensing system, there are currently 94 listed factories that have issued operating licenses with a total of 121 operating licenses, of which 42 have the discharge scale that should be declared by the Environmental Protection Agency. 42 inspections were completed for the companies that announced the amount of emissions that should be reported. In addition to confirming the current status of on-site pollution control and updating the amount of pollution emissions, updated and expanded information was established in the database to cooperate with the EPD’s inspection results every time. Corrected 1,147 abnormal fields in the database every month. In order to maintain good air quality in Hualien, this plan continues to promote air pollution reduction. Among the operating licenses issued this year, a total of 6 processes have completed pollution reduction operations. The reduction methods are switching to low-polluting fuels and increasing the frequency of boiler maintenance. etc., a total reduction of 81.1 metric tons of particulate pollutants, 150.5 metric tons of sulfur oxides and 191.8 metric tons of nitrogen oxides. This year, experts and scholars have been hired to complete at least 4 contract specifications for the 4 major factories to review the license. At present, the 4 major factories have submitted a total of 4 license applications, which are the operation changes of Asia Cement Co., Ltd. Hualien Manufacturing Plant (M02, M03), Taiwan Cement Co., Ltd. The company's Heping Branch Heping Plant (M01, M02) has changed operations. In addition, in the part of outsourced review operations, for at least 8 contract specifications for "setup, change, operation and 4 major factories" license application cases, this stage implements Mennonite Hospital (M03), Vigorous Medical Foundation of Taiwan Christian Mennonite Medical Foundation Industrial Co., Ltd. No. 2 Plant (M01) and Xin Zhandong Co., Ltd. (M01), a total of 3 pieces. Completed the review of 106 test plans for 30 factories and 157 test reports for 54 factories. The common lack of test reports in the past, such as incomplete data or insufficient consistency of data comparison, etc., will continue to be required. , Most of the testing companies have been able to do a good job in quality control. In terms of inspection management operations, a total of 2,577 inspection records were filed, including 2,365 inspections (1,167 incidents) and 212 inspections for compliance with the implementation of the plan. Major pollution sources are the main sources; in addition, 241 industrial zones have been checked for compliance with laws and regulations, and the check rate is 100%. The perimeter odor sensory measurement has completed 5 times of detection and analysis; the discharge pipeline has completed 5 times of dioxin and 4 times of heavy metals. The sampling and analysis results all meet the emission standards. In addition, according to the inspection and testing results, a total of 10 cases were punished at this stage, with a total punishment amount of 2.6 million yuan, and the improvement completion rate was 90%, because during the improvement period, counseling and improvement tracking operations will be continued. The reporting month for air pollution fees in the third quarter of 20110 is from October 1, 2011 to December 31, 2011. At this stage, the review and accounting of the third quarter of 20110 have been completed. Therefore, the statistics of sulfur oxides and nitrogen oxides should be declared 139 The total declared emissions were 1,265 metric tons of SOx emissions and 3,155.23 metric tons of NOx emissions, with a total accounting amount of 33,705,839 yuan. The particulate air pollution fee should be declared by 225 companies, with a total declared discharge volume of 559.77 metric tons, and the total declared air pollution fee is NT$18,816,297. The volatile organic compound air pollution fee should be declared for 127 companies, with a total declared emission of 46.89 metric tons and an accounting amount of 742,345 yuan. 225 companies should declare air pollution charges for lead, cadmium, mercury, arsenic, hexavalent chromium and dioxin, with a total declared emission of 0.255 metric tons and a total amount of NT$101,944. The total amount of air pollution charges collected in the third quarter of 2011 is RMB 53,366,425, and 20 companies still need to be paid, with a total amount of RMB 831,257. In the emission control part, 1,111 cases of compliance with management measures were checked, 305 cases and 76 cases were negotiated by the earth, stone and ready-mixed concrete industry, 929 vehicles were followed by sand and gravel vehicles, 81 road adoption companies were signed, and 1 set of ports was maintained. District vehicle identification system and 2 river dredging vehicle identification systems; for those who do not conform to the inspection, they are required to complete the improvement work within a time limit. Continue to promote the adoption of cleaning roads by enterprises. The total length of the adopted roads is 63.8 kilometers, and the total length of cleaning in this stage is 35,634.7 kilometers. An increase of 2.3%. In the part of innovative practices, in order to cooperate with the Environmental Protection Department's suggestion that the pollution prevention/reduction of various activities in Hualien Port should be included in the pollution prevention document and carry out the relevant negotiation section, this working team takes the "refinement of pollution control in the port area and increase the reduction rate of pollutants" as the The title of the annual innovation method, here, firstly held the pollution reduction research and business meeting on February 18, 2011, and all the operators in the port area signed the voluntary pollution reduction commitment letter. In addition, on March 26 and July 21, PM10 and PM2.5 monitoring was carried out for the operation area of the port area. The monitoring results showed that the concentration of vehicles was high when they were passing, which has been included in the object of enhanced control. The work team also carried out monitoring on November 9 and November 24 respectively to grasp the improvement situation of the industry. When there are vehicles passing by, the PM10 and PM2.5 concentrations fluctuate slightly, but the concentrations have dropped significantly. In addition, on May 12, 2011, Asia Cement Co., Ltd. completed the whole shore power project for cement ships, with a total power consumption of 380,000 kWh, a total reduction of 517.92 metric tons of marine oil, NOx 344.81 metric tons and SOx 79.64 metric tons, and CO2 emission reduction of 1,872.57 tons. mt. This year's in-depth inspection work has completed the in-depth inspection of 2 plants including China Pulp Mill and Taiwan Cement Heping Plant. The inspection is carried out by not informing the operators of the inspection time. The inspection contents include on-site inspection, on-site inspection by committee members, document inspection, night inspection and unknown gas sampling. Analysis (GC/MS) and several other key tasks. In addition, through cooperation with major projects, the first empty product monitoring station was set up at the gate of Huazhi to perform continuous monitoring of hydrogen sulfide at the perimeter of the plant, and combined with meteorological data to analyze the source of pollution in reverse trajectory, and cooperate with infrared imaging leak detectors to conduct on-site inspections to control emissions. Properties and Odor Potential. According to the monitoring data of the station, experts and scholars were hired to carry out the second-stage in-plant diagnosis on the Zhonghua Pulp Mill on August 13 and November 12, 110. It was found that although the mud washing machine was sealed, there was no gas gathering equipment for follow-up treatment. And because there is no gas gathering equipment at the feeding place of the digester, when the lid is opened, there is obvious odor and odor escape, which leads to a high concentration. The sludge washing machine plant is expected to complete the addition of air-collecting windmills and washing equipment in a closed space by the end of December 2021; 11 gas-collecting equipment for digesters have been budgeted and are expected to be completed in April next year. On October 28-29, TCC Heping Plant completed the field survey of experts and scholars, and all suggestions and deficiencies were improved on October 25. In addition to completing the work objectives specified in the contract, the work team submitted 6 negotiated matters on February 4, 2011 according to the negotiated matters in the negotiation record, and included them in the contract work after being verified by the Environmental Protection Bureau.
Keyword
Fixed pollution sources, permit control, air pollution fees, inspections, emissions, boiler replacement
Open
top