2021 Project of Prevention and control the riverbed fugitive dust in Taichung City
Absrtact |
This project has started from the 15th of May 2021, and officially completed on 14 May 2022.The entire process was followed by the schedule specifications. As of the 25th of April 2022, the achievement rate was up to 100%.The main propose of this project is to improve the dust forecasting system integrity and can be separated into four aspects:Strengthen the river aeolian dust forecast model,Upgrade the aeolian dust forecast contingency mechanism,Implementation of the collaboration platform,Enhance public satisfaction.
According to the observation of riverbed changes, there was an accomplishment of bare lands improvement works with a total area of 64.46 hectares by Inter-Agency Cooperation. This made a decrease of 110.08 hectares of bare lands compared to the same period last year.15 micro monitoring devices were established near three main river area. Based on the data analysis, In-Situ can mainly divided into 3 parts, including long-range transport ,
|
---|---|
Keyword |
riverbed fugitive dust, monitoring and analysis , early warning system
|