To the central content area

110 Years Tainan City Construction Site Pollution Control Audit Plan

Absrtact
According to statistics, during the implementation period of the plan, from May 13,2021 to April 30,2022, there were 8,074 cases of construction projects being declared and started, and the total amount of air pollution fees paid for the cases declared to be started was NTD336,031,633 dollar; the total number of completed settlement cases For 6,253 cases, the total refund amount was NTD19,716,141 dollar, and the total repayment amount was NTD58,071,493 dollar; in addition, 1,286 construction sites were subject to late payment fees and interest due to late declaration, and the total amount levied was NTD2,071,120 dollar. After statistics of the above-mentioned relevant amounts, the total net amount of air pollution charges for construction is NTD376,458,105 dollar. In addition, in terms of the utilization rate of the network cloud system, the proportion of using the Internet to declare is 56.56%, the proportion of the payment slip downloaded from the cloud is 42.06%, and the overall utilization rate of the network cloud system is 98.62%. In terms of construction site control, there are 12,923 construction sites under construction, 18,841 construction site inspections have been carried out, 9,401 construction sites are under management, and the acceptance rate is 72.7%; the compliance rate of construction site inspection regulations is 92.1%, of which 92% for first-level construction sites and 92.7% for second-level construction sites. 92.4%. As for the total amount of pollution generated by the construction site (PM10) was 10,699.24 tons, 18,191.71 tons were inspected and managed, and the pollution control rate was 94.46%. The reduction amount achieved by the establishment of relevant control measures at the construction site totaled 6,594.2 tons of emissions after pollution control. It was 4,105 tons, and the pollution reduction rate was 61.63%. Among the promotion items related to the construction site, including promoting 71 construction sites to carry out road cleaning and adoption, the total length of the cleaning implementation is 36,232.83 kilometers. Promote the laying of straw drapes at 7 construction sites, covering an area of 206,547m2, which effectively assists in the removal of straw and reduces open burning behavior. In terms of the control of open burning of rice crops in Phases one and second, the inspection area of rice crops is 20,161.21 hectares. In addition, 4 units have been promoted to include the "no open burning" clause in their lease contracts. The total lease area is 513.99 hectares. 189 bits. As for the improvement of bare land, 29 bare land were improved, with an improvement area of about 91.28 hectares, including 65.54 hectares of riverbed bare land and 25.74 hectares of general bare land. In terms of folk pollution reduction work,before Chungyuan and Ching Ming Festival held a business meeting of inter-office consultations. During the Chungyuan period, each district team strengthened the removal of incense feet to avoid fires, removed non-paper money items such as plastic bags, and detailed labor matters. Be explained. Conduct 1 merit prayer ceremony. During the Chungyuan period, statistics were collected from various guava pagodas, temples, community buildings, people, institutions, schools, company offices, markets, etc., and a total of 409 units of paper money were applied for transportation, with a total transportation capacity of about 190.77 metric tons. A total of 870 people replacing paper money with merit, and the total response amount was 533,198 yuan, a reduction of about 11.73 tons of paper money burning. During the Ching Ming Festival, according to the statistics of Ossuary, temples, community buildings, people, institutions, schools, company offices, markets, etc., a total of 226 units of paper money were applied for transportation, and the total transportation volume was about 312.87 metric tons. A total of 2,581 people replacing paper money with merit, and the total response amount was NTD1,512,548 dollar, a reduction of about 33.27 tons of paper money burning.
Keyword
Tainan City Construction Site Pollution Control Inspection Program
Open
top