According to the contract to standardize the work items and content, and in line with the requirements of your bureau, complete the prescribed work items within 2011 and submit a report on the results of the work, and submit the report on the execution results of the previous month at the beginning of each month. Up to now, a total of 54 construction sites have completed the signing of consent for site self-management (38 new sites in the year). In terms of road adoption, there are currently 54 sites (38 new sites in the year) with a cleaning length of 53,383 kilometers. Construction project inspection and inspection A total of 4,700 cases have been completed, and 2,444 cases of air pollution fee collection and reminders (collection / reminders) have been collected, and the number of reminders has reached 88. The rest of the implementation results from January to December are as follows. :
(1) Inspection and control operations
In 2011, a total of 4,476 construction site pollution control inspections were completed, of which 4,281 were missing 0, accounting for about 96%, 179 were missing below 10, accounting for about 4%, and 16 were severely missing above 10, accounting for less than 1%. The most of 14% are the lack of 4 points of the dust-proof net buckle when the material is stacked and the dust net is not completely covered, followed by 12% of the lack of 4 points of the dust-proof net of the structure and 12% of the lack of 4 points of the road pavement in the construction area. At present, there are 7 cases of violations reported with a total amount of fines of 300,000 yuan, all of which have been improved. Compared with the inspection targets set at the beginning of the implementation of this plan, the cumulative achievement rate of inspections in each month has reached 100%. Among them, the number of inspections in each township and city is the largest in Hualien City with 1,125 and Ji'an Township with 1,028, followed by Shoufeng Township with 473 and Xincheng Township with 427. In terms of project categories, 2,496 other projects and 983 construction (RC) projects were the main inspection points.According to the statistics of the number of inspections, there are currently 224 inspections, with 82 other types of projects being the most, followed by 63 construction (RC) projects. According to the statistics on the number of inspection cases in each township, Hualien City with 64 cases and Ji'an Township with 38 cases are the main inspection focus areas.
In order to implement noise control on construction sites, the project personnel have carried out a total of 109 active inspections and measurements of construction site noise in 110 years. The noise measurement is carried out according to the main construction machinery on site, including strange hands, cranes, crushers, and forecasters. Machines and tools that are prone to noise sources, such as mixer trucks, measure Leq and Lmax according to regulations. So far, a total of 19 construction sites have been found to have excessive sound levels during construction. After communicating with the industry to improve and re-examined within the improvement period, there are no cases of exceeding the standard. Statistics of the noise measurement results of the 64 construction sites show that the measurement range of Leq is between 52.5 and 81.2dB(A), and the measurement range of Lmax is between 57.6 and 98.1dB(A). Projects with higher Lmax values are mostly concentrated in excavation and pile arrangement.
(2) Collection of air pollution control fees for construction projects
Statistics on the collection of air pollution prevention and control fees for construction projects in 110 years, a total of 61,862,121 yuan was collected, of which "dredging projects" collected the most at 29,173,855 yuan, accounting for 47% of the total collection amount, followed by other types of projects. The collection of 1,5082,979 yuan, accounting for the total amount twenty four%. In 2010, the air pollution prevention and control fees for construction projects totaled 66,203,697 yuan, and the amount collected in 2011 was 4,341,576 yuan less than the same period last year.
From January to December 2011, the county has the largest number of applications for refunds due to changes in contract funds, with a total of 327 cases, with a total refund of 1,161,997 yuan; followed by 145 applications for refunds due to shortened construction periods, with a total of 145 refunds. 835,421 yuan. There are still many cases of application for refunds due to changes in contract funds. The number of refunds for construction air pollution fees due to certain factors such as changes in project types shows a decrease year by year.
(3) Audit and reminder operation of air pollution fees for construction projects
Statistics 110 When accepting the declaration of air pollution fees for construction projects, in order to avoid delays in payment due to public lack of understanding of laws and regulations, or failure to complete payment as scheduled due to the budget preparation and application of relevant units of the industry, the planners took the initiative to call to remind them to pay. A total of 88 cases, the payment amount is 4,478,774 yuan, and the reminder rate has reached 100%.
(4) Noise control of motor vehicles and investigation of non-ionizing radiation sources
During the plan period, 45 times of motor vehicle inspection and inspection (inspection) operations have been carried out. The police will inspect and inspect the vehicle according to the noise level of the vehicle. A total of 418 vehicles have been inspected and inspected. The relevant records of inspection operations are compiled. Submit it to the Environmental Protection Bureau for follow-up procedures, and uniformly list unqualified vehicles as the objects to be notified for inspection.
In addition to carrying out inspection (inspection) operations according to work items, it also regularly compiles data from the Noisy Vehicle Reporting Website and the Police Tranquillity Project to screen suspicious noise vehicles that have been reported, assist in the administrative procedures for notification of arrival for inspection and on-site inspection operations. During the painting period, a total of 93 automobiles and locomotives have been notified and inspected, of which 72 are roadside inspections and special inspections, 15 are noisy vehicles, 3 are moved in by the police, and 3 are moved in from other counties and cities. vehicle.
In this year (110 years), more than 40 non-ionizing radiation measurement operations should be carried out in this county, and 40 times have been completed during the planning period. .
(5) AI sound camera technology for law enforcement
Use the array type license plate recognition system to detect and detect motor vehicles with noise in driving. The relevant laws and regulations were revised in December 2019 and put into use in January 2011. The legal basis for noise control of motor vehicles is improved. This project is based on the "Motor Vehicles Driving Noise Measurement Method - Image Aided Law, "Motor Vehicle Noise Control Standards" and "Measures for Noise Control of Motor Vehicles in Use" require that the acquisition of sound camera and other equipment in 109 years will be obtained on March 25. Certification and acceptance work are carried out to comply with the three procedures of certification, verification and inspection stipulated by the DSD. This year, 34 sessions have been carried out, a total of 12,792 vehicles have been identified, 2 vehicles exceeding the noise control standard have been seized, and 50 vehicles have been notified for inspection. , after the violator has been notified in accordance with administrative procedures to make a statement, and after the expiration of the period, the follow-up sanction will be handled.
(6) Innovative approach-construction engineering construction equipment pollution reduction and management work
In December 2019, the Environmental Protection Agency formulated a 110-year evaluation work item for each county and city, conducted investigations and compilations on construction projects using construction equipment, and reviewed and recorded the smoke exhaust conditions of key construction equipment on-site operations.
Construction equipment uses diesel engines, which will emit granular pollutants. Most of the domestic construction equipment is imported from Japan. There are many types of old equipment. There are many types of construction equipment, and their operating behavior is not like ordinary large vehicles that run all day long. Construction equipment depends on The project is in operation, so it is managed through inspection to grasp the current status of construction equipment in the county. The implementation content is as follows:
1. Contamination control rate of construction equipment in construction projects
At the end of February 2011, the Environmental Protection Agency notified the counties to set the number of control targets for the management of construction equipment. Hualien County has a target of 33 vehicles. It has also conducted investigations and compilations on the construction projects of construction equipment. , Machine type, machine year, machine type, machine engine number, etc. The machine engine number is used as the unique value. If the engine number cannot be known, the self-made number can be used.
2. Pollution control rate of construction equipment in construction projects
According to the requirements of the assessment project of the Environmental Protection Agency (the number of labels issued by the construction equipment × 2 + the number of black smoke detection of the construction equipment × 1.5 + the visual pollution of the construction machinery and equipment × 1 + the number of oil pumping by the construction equipment × 0.5) ÷ the number of pollution mastery of the construction equipment) , The number of pollution control of machinery and equipment is unique to the engine number, including the number of construction machinery and equipment issued and issued, the number of construction machinery and equipment black smoke detection, the number of construction machinery and equipment that are visually free of pollution, and the number of construction machinery and equipment pumping oil. Therefore, the number of targets set in the preceding paragraph is used as the denominator of the control rate target 18, and the main annual target is to issue at least 18 badges for items with high weights to meet the evaluation requirements.
3. Achievements at this stage
After the plan was approved on March 3, 2011 to approve and pass the innovative approach, there are 33 construction equipment pollution control lists, 33 construction equipment have been investigated, 10 oil sampling tests, 18 visual inspections for smoke, and 18 inspections. The results are all in line with the legal value, and a total of 18 vehicles have been issued and issued. The compilation of various results has been completed on November 1, 2010 in accordance with the requirements of the Environmental Protection Agency's 110-year evaluation.