To the central content area

2021 Taichung City Construction Project Inspection Plan

Absrtact
The infomation collection and analysis have been completed regarding to the construction levying, management, air pollution reduction as well as the results for the period of the final report(from March 24, 2021 to January 31, 2022). Based on the proposed governance strategy, the summary of the executions is described as below: 1.Totally 9,735 cases of the Construction project air pollution prevention fee collections have been completed(includes 5,268 cases of the construction start application, 4,339 cases of the construction complete application and 128 cases of constructor change applition). The total amount collected is NTD $ 135,252,826. The online application rate is 93.40%. 2.10,151 inspections have been conducted within the year. The signature rate is 90.74%, the admission rate is 73.25% and the compliance rate is 98.46%. 3.20 inspections of the vehcle emission have been conducted, of which 15 vehcles have meet the emission standard. 4.During the execution period, 30 aerial photography operations were performed over for the regional development projects. 5.The total length of the road surveying conducted within the year is 4,763.6 km, in which Class A roads take up 92.28%, and Class B roads take up 7.72%.
Keyword
Construction work air pollution fee, Construction site inspection, Construction detection, Street cleaning, miniature sensors
Open
top