(1) Review of water pollution prevention and control applications and declaration documents:
This plan has accepted and completed the review of 63 applications, totaling 100 applications, and another 3 applications were rejected because the number of days for correction was exceeded, and 10 applications were approved and completed on site. In addition, we have completed the review of the regular inspection application data for the second half of 110 and the fourth quarter, the first half of 111 and the second quarter, and have sent the result letter to the Environmental Protection Bureau for reference.
Monthly collection of various water permits (documents) within the jurisdiction that are valid for less than 6 months and have not yet been applied for extension. The statistics are as of November 30, 2011. At present, there are 6 objects that should be extended but have not yet applied (respectively Taihuang Enterprise Co., Ltd., Youhao Enterprise Co., Ltd., Chengyi Enterprise Co., Ltd., Taitung Branch of RT-Mart Distribution Co., Ltd., Lai Yongmei Pig Farm and Haoye Quarry).
(2) Verification of water pollution sources and sampling and testing operations:
As of November 30th, 210 inspections have been completed, with a completion rate of 100%. According to the statistics of the distribution of inspection industries, animal husbandry is the most, followed by catering, tourist hotels (restaurants), and construction sites. These three industries accounted for 52% of the total number of inspections; 60 water quality sampling and testing operations were completed, and 5 enterprises released water inspection reports that did not meet the requirements, including Rifeng Animal Farm, Tabiras Ranch, Catholic Hualien Diocese Medical Taitung St. Mary's Hospital, RT-Mart Distribution Co., Ltd. Taitung Branch, and Taitung City Water Resources Recycling Center have submitted the test results to the environmental protection agency for subsequent disposal.
Completed 13 sub-in-depth inspections, and the inspection objects were Yangchen Enterprise Co., Ltd., Youhao Enterprise Co., Ltd., Taiyuan Skills Training Institute of the Correctional Department of the Ministry of Justice, Livestock Pig Farm, Shunyuan Ranch, Aixin Ranch, Tianping Livestock Farm, 13 subsidiaries including Brothers Sand and Gravel Plant, Junfa Sand and Stone Plant No. 2, Haoye Quarry, Luyuan Sand and Stone Plant, Xiangxing Sand and Gravel Company, and Chuangchuang Biotechnology Co., Ltd.
(3) Functional evaluation of wastewater treatment facilities of listed enterprises:
Completed the tracking of 110 annual executive function evaluations that did not improve the items, all of which have been improved. According to the screening principle, two companies, "Mingyuan Development Co., Ltd." and "Creation Biotechnology Co., Ltd.", were selected for this year's functional evaluation. The on-site evaluation (preliminary evaluation) and sampling work were completed on June 21, 2011. , On July 26, 2011, experts and scholars conducted on-site re-evaluation work, and finally held a consultation meeting of the evaluated units on August 19, 2011.
(4) Automatic monitoring of water quality and quantity (viewing) and stable operation of the connection transmission facility system:
This plan confirms the connection status of the connection object every day (the working day of the agency), and maintains the operation of the host equipment of the management connection transmission facility system. On September 15th and 16th, "Foyu Enterprise Co., Ltd. Jilin Factory", "China Pulp Co., Ltd. Taitung Factory", "Taitung Water Resources Recycling Center" and "Zhiben Water Resources Recycling Center" that should set up CWMS in this county Center", reviewing the measure description and measure confirmation report and checking the on-site connection signal, and sending the check results and improvement tracking situation letters to the agency for reference.
(5) Collection and verification of water pollution prevention and control fees and evaluation of their effectiveness:
The collection data of water pollution fee shows that there are 116 households that should declare in the 11101 period of 2011, all of which have completed the declaration. The declaration rate of this period is 100%, and the total payment amount is 2,351,802 yuan. Assisted the agency in handling the cessation of collection and settlement of water pollution prevention and control fee declaration cases for 3 businesses - Zhanxian Enterprise Co., Ltd., Yuye Enterprise Co., Ltd. and Donghui Slaughterhouse, except for those businesses that had doubts about the 110-year water pollution fee declaration notified by the Environmental Protection Agency In addition to conducting on-site inspection operations, another 5 institutions were added to perform inspection operations, and a total of 19 on-site inspection operations were completed. The inspection results have been compiled and sent to the authority for reference
(6) Domestic sewage pollution reduction operations:
This year, it has been set up on May 20, June 12, and June 19, 2011, respectively in conjunction with the "Taitung County Women's Growth and Care Association Activities", "2022 Taitung National Green Living Environment Education Carnival" and "World Ocean Day". Booth to promote the reduction of domestic sewage.
(7) Handling water pollution regulations and policies publicity briefings and inspection and control education and training:
In order to improve the operational skills and capabilities of the personnel in the bureau in the inspection of industrial wastewater, this project assisted in the implementation of a session of education and training on water pollution inspection regulations and skills for agency personnel on April 20. In addition, in order to effectively publicize policies related to water pollution laws and regulations, 3 water pollution laws and regulations briefing sessions were completed. A total of 500 publicity materials with the theme of water environmental protection will be submitted.
(8) Assisting agencies in the assessment of river pollution control:
According to the review opinions of the Environmental Protection Agency, the annual specific actions and key performance indicators (KPIs) of key measuring stations in the "Water Pollution Prevention and Control Assessment" in 2011 have been revised. And before the end of September and October, submit the 2011 "Water Pollution Prevention and Control Assessment" results report, annual results summary, self-assessment form and briefing report to the agency for reference.
(9) Analysis of 10-year data of key stations
This project has analyzed the single trend chart of biochemical oxygen demand, suspended solids, dissolved oxygen, ammonia nitrogen and river pollution indicators of key measuring stations from 101 to 110, and reviewed the improvement effects and refinement measures implemented from 101 to 110. It was submitted to the Bureau for future reference on June 9, 2011.
(10) Emergency Response to River Water Pollution Incidents
This plan has submitted the river pollution emergency response letter to the Bureau for approval on May 6, and has also held a river water pollution emergency response meeting and education training session on June 10.
(11) Carrying out the water environment patrol team's clean stream and river cleansing and energy-enhancing training activities:
This plan has completed 4 sessions of Jingxi Jingchuan, 4 sessions of education publicity and energy-enhancing training activities (including 1 session of visits and emulation activities outside the county); completed 1 session of training activities for water environment guides.
(12) Assisting the operation and operation of the water environment patrol team:
On March 8, 2011 and November 29, 2011, we assisted in the 2 business counseling meetings of the Patrol Team in 2011, and put forward relevant proposals for the volunteer operation of the Patrol Team, which were discussed and handled by the chairman and the on-site team leader. Assisted the Water Environment Patrol Team in notifying 10 cases and clearing them up.
(13) Garbage interception operations in surface water bodies:
Has assisted the county in the implementation of ground water waste removal operations, and reported the results of the implementation of the operations in the "Surface Water Body Waste Removal Management System" online before the 10th of the next month. The current score has accumulated to 83 points.