To the central content area

2022 Chiayi City Stationary Pollution Source Permit Inspection Control and Air Pollution Fee Reminder Payment Review Plan and Environmental Permit Integration Plan

Absrtact
The summary of the implementation results of the work of this plan is as follows: ( 1 ) Licensing and control operations 1. After all kinds of license application cases go through the two procedures of document review for completeness, consistency, rationality and legality and on-site review for verifying the authenticity of the application materials, the formal license granted content shall be formulated in accordance with the license management regulations and be issued. During the implementation of this plan, till December 15, a total of 10 applications for various types of operation permits were submitted in this city, 6 applications (changes) for operation permits and 4 extensions of permits. 2. There are 48 operating permits for fixed pollution sources in this city . According to the contract, 25 operating permits should be spot-checked this year. Till December 15 this year, 30 license checks have been completed with the work completion rate 100%. After the annual spot check of this plan, statistics are made according to the check results. Keming Enterprise Co., Ltd. (Other synthetic resin or plastic manufacturing procedures M01): During the on-site inspection of the permit, it was found that the factory had not handled the change of the responsible person due to the death of the responsible person, and Qingzhen Industrial Co. , Ltd. Co., Ltd. (other metal heat treatment procedures M 01 and M02) : During the on-site inspection of the permit, the newly added control equipment on the factory site was seized. Maoxin Wood Industry Co., Ltd. (Other wood and bamboo product manufacturing procedures M01) : The on-site waste gas flow direction is slightly inconsistent with the permit flow diagram. Chiayi Iron Wire Products Co., Ltd. (metal surface cleaning procedure M 01) : During the on-site inspection of the permit, it was found that E004~E006 pollution sources were removed from the site. Chiayi Meat Market Co., Ltd. Company (boiler steam generation procedure M 02): E202 due to the removal of pollution sources, we guided the industry to carry out license abolition operations; Maohui Industrial Co., Ltd. (other food manufacturing procedure M 01): update on-site equipment, increase the prevention and control of control equipment efficiency, Far East Machinery Industry Co., Ltd. (Metal Sandblasting Process M0 5) : During the on-site inspection of the permit, it was found that the cycle of the electronic registration form was missing, and the industry was asked to supplement it according to the daily consumption of raw materials on site . Shin Harn Plastic Enterprise Co., Ltd. (plastic bag manufacturing procedure M0 1): During the on-site inspection of the permit, the on-site update equipment was seized, Yongshun Technology Co., Ltd. (boiler steam generation procedure M 05): during the on-site inspection of the permit, the on-site equipment update was seized and increase the control efficiency, etc. The 10 licenses of the above-mentioned 9 factories have all been completed the guidance of the industry to apply for license changes and immediately improved after it’s done, and the remaining 21 licenses have not been found any flaws after on -site inspection and verification. ( 2 ) Examination and verification of emission declaration 1. The list of 16 factories that need to declare the number of emissions in 2022 is 4 factories and 16 cases, which include 2 factories in the first batch and 2 factories in the second batch. 2. Among the batches of factory emissions that have been declared last year, the statistical annual emissions (4 factories), the pollutants in the year 2021 are 1.765 tons of granular pollutants, 5.909 tons of sulfur oxides, and nitrogen oxides 79.905 tons and 70.899 tons of volatile organic compounds; the observation of the declared emissions shows that compared with last year, the emissions of sulfur oxides, nitrogen oxides and particulate matter of Yongshun Technology Co. , Ltd. have a significant downward trend; The inspection confirmed that the main reason for the decrease in emissions was the decrease in the coefficient of the results after the test, which led to a decrease in the declared emissions . 3. Since the implementation of this plan, the review of emissions declarations from the first quarter of 2022 to the second quarter of 2022 has been completed, and the review and confirmation of each supplementary declaration list has been carried out. The project team will review the online declaration data and confirm the emission declaration results of each factory after the declaration operation is completed in each public and private place. Afterwards, the on-site emission inspection will be scheduled, and on-site guidance and inspection will be carried out to confirm the accuracy of the correctness of declaration data. ( 3 ) Data maintenance update and expansion operations 1. The project contract needs to update and maintain 70 cases in the database QA/QC operations. Till December 15, 2022, a total of 237 cases of on-site survey and update of public and private place data and database data update and filing operations have been completed with the completion rate 100 %, and the relevant inventory results are all entered into the fixed source database system with the work completion rate 100% . The main reason for the advanced inventory items is that this year's inventory operation includes not only the existing public and private places under management, but also the implementation focus of this year-one year one industry (printing industry) inventory and unregistered public and private places and other related inventory operations. After the on-site data update and expansion of public and private places, the basic data, process, equipment and pollution sources have no changes, accounting for 82%, and the release of management (including closures and non-polluting processes) accounted for 11%. After the update, Chiayi City has 232 public and private sites for fixed pollution sources, 261 operating processes, 839 pollution sources, 133 control equipment, 161 discharge pipes, 401 storage tanks, and 19 dumps . 2. According to the statistics of the fixed pollution source database that has been completed, the amount of air pollution managed by the jurisdiction after the update of process pollution emissions is 17.37 tons/year for granular pollutants, 13.48 tons/year for sulfur oxides, and nitrogen oxides. 99.92 tons/year of pollutants, 147.97 tons/year of volatile organic compounds , and 33.19 tons/year of carbon monoxide . ( 4 ) Collection of air pollution charges 1. This year's working group cooperates with the factory inspection operations, and has a total of 75 public and private places within the jurisdiction that should be levied air pollution fees, including 59 companies that declare air pollution fees for sulfur oxides and nitrogen oxides, and 58 companies that declare air pollution fees for volatile organic compounds and 64 companies that declare granular substances. 2. For the declaration of volatile organic compounds, the declaration and payment amount of the declaration industry is the highest of about 62.3% paid by the Solvent Chemicals Division of Taiwan Petroleum Corporation (Shares) Corporation. 3. In addition, according to the statistics of the payment status of the declaration materials from the first quarter of 2019 to the fourth quarter of 2022, the total paid-in amount in the past three years is $NTD 3,975,967, and the average annual income is 1,325,322 dollars. The actual income in 2021 was 1,869,922 dollars, which was higher than the annual average income, mainly due to the fact that the Solvent Chemicals Division of CNPC Co., Ltd. carried out a comprehensive inventory of raw materials in the plant, and corrected the vapor pressure and material density of the storage tank, which caused that volatile organic compound air pollution charges have been greatly increased. There are a total of 55 quarterly declarations, and all declarations from 2022 to the second quarter have been completed. However, because 20 companies belong to annual declarations, the declaration materials will be declared and followed up for review and settlement in January 2023, so the 20 companies have not yet included in the analysis. As for, air pollution fee declaration rate, the average rate of air pollution fee declaration and payment from the first quarter of 2019 to the Third quarter of 2022 is 100%. ( 5 ) Checking operation of air pollution fee 1. This year's planning team conducts relevant inspections on public and private places declaration for air pollution charges. As of December 15, 2022, 40 on-site inspections of SOx /NOx, 43 on-site inspections of VOCs, and 42 inspections of particulate matter were conducted with the work completion rate 100%. 2. As of December 15th, 125 companies have been checked, of which 2 companies found that the amount of activity was wrong after checking, and the system was reviewed and corrected. The remaining 123 companies did not find any flaw situations. ( 6 ) Fixed source inspection control and testing operations 1. Work goals are set that it is estimated that there should be at least 200 checkups and inspections of public and private places that are classified as regulated and non-regulated. As of December 15, a total of 706 checkups and inspections have been performed. Among them, there were 432 inspections and 274 inspections. As for the inspection operation, the factory inspections are currently in good condition. In the part of audit operations, active audits accounted for 47%, followed by fugitive audits accounting for 20 %. If the statistics are based on petition inspections, 39% are regulated and 61 % are not regulated. This year 's general petition inspections are still mostly non-regulated public and private places. 2. In terms of compliance with laws and regulations on fixed pollution sources this year, the statistics show that as of December 15, the planning team has completed (1) 1 flue gas inspection and testing operation for public and private places under its jurisdiction, and the results of the inspection and testing report have been completed, which has been reported to the bureau for verification and preparation. After this test, the nitrogen oxides of the plant exceeded the legal emission standards by 100 ppm, the detection value is 235 ppm, currently the relevant documents and materials are still in the administrative process, and follow-up will be punished according to the regulations ; (2) We have performed a relative accuracy test and check operation once, and this operation is scheduled to be carried out on June 29 for incineration plant M 01 Process P001 discharge pipeline sampling test, and the relevant inspection results are in compliance with regulations; (3) Gas -oil ratio/ air leakage detection at gas stations has been carried out for 2 stations, and the inspection results after random testing are in compliance with regulations; ( 4) Execution of equipment components 1,000 points of relevant inspection and inspection results are in compliance with laws and regulations; in addition, the project team will continue to track and inspect highly polluting factories in the jurisdiction to effectively prevent illegal activities and reduce public complaints . ( 7 ) Stationary Pollution Source Licensing and Air Pollution Fee Publicity Briefing Session In order to strengthen the implementation direction of environmental protection regulations and various control measures of the city in public and private places listed and managed in the jurisdiction, it is necessary to hold a publicity meeting on laws and regulations related to stationary pollution sources this year. This year's meeting was held on April 28, 2022, in the meeting room on the 4th floor of the Chiayi Business Office of Taiwan Petroleum Corporation. The control work items and the items that need to be coordinated by public and private venues were explained separately. This year's fixed pollution source environmental protection regulations and control promotion In the explanatory meeting, Professor Mi, Xiaoxuan from Chianan University of Pharmacology was invited to explain the control work items and the items that public and private venues need to cooperate including pollution emission control technology and other projects and explanations that need to cooperate with public and private places and related cooperation matters this year in order to improve the industry's awareness of laws and regulations through legal publicity, avoid related deficiencies in violation of laws and regulations. In addition, for those who did not attend, relevant laws and regulations will be notified one by one during the on-site inspection. In addition, in order to simplify administration and facilitate the people, the time and burden required for operators to apply for air, water, waste, and poison separately has been reduced, also reducing the limited review resources of the competent authority, and comprehensively inspect the pollution control of the entire plant and respond to the promotion of the Environmental Protection Agency of the Executive Yuan with the integration policy of one factory, one permit, through the handling of this meeting, and we also explained the environmental protection department's plan for the integration of air water, waste, and toxic environmental protection permits, and established a communication channel between the industry and the competent authority, hoping to reduce the number of issues issued by the agency for the review opinions repeating back and forth to speed up the administrative efficiency of various environmental protection permit declarations. This meeting was held on June 24, 2022 at the conference room on the 4th floor of the Taiwan Petroleum Corporation Chiayi Sales Office for consultation, guidance and explanation Meeting. This time, a total of 10 public and private places in this city that meet the above conditions for the integration of environmental protection permits are invited. Besides, because the number of public and private establishments participating in the trial implementation of licensing integration in this city is relatively small, and the scale and process are relatively simple, this plan also conducts counseling work during the briefing session, effectively explaining the questions of the operators, and assist in the completion of the drawing of the permit integration pollution flow diagram (four- state diagram).
Keyword
Fixed pollution sources, fixed pollution source control fees, permits, gas stations, control of waste incineration plants, equipment components, reporting, review
Open
top