To the central content area

111 Lianjiang County Pollution Source Control Plan

Absrtact
The implementation period of this plan is from January 1, 2022 to December 31, 2022. The main work items include: air quality planning and indoor air quality management, stationary pollution source control work, mobile pollution source control work, negotiation project operations and related coordination matters assigned by the bureau. According to statistics, the overall implementation rate of actual work projects so far has reached 100%, and some of the work projects have also exceeded the scheduled targets. In air quality planning and indoor air quality management: The AQI value of the Matsu measuring station is currently on a downward trend compared with previous years. In addition, analysis of the Matsu measuring station and China coastal measuring stations shows that the average concentration of some pollutants has a downward trend this year, indicating that the epidemic It still has a certain impact on China’s air quality. This year, due to the COVID-19 epidemic, the relevant publicity meetings in the first half of the year could not be held as scheduled. This year, 10 publicity work on response to the deterioration of air quality has been held to effectively enhance the county residents’ understanding of air pollution and related protection awareness; for indoor In terms of air quality control work in places under management, we have assisted Datong House in Lianjiang County and Matsu Office of the Labor Insurance Bureau in applying for indoor air quality independent management labels, and obtained excellent and good labels respectively. In the control of fixed pollution sources: At present, Xiju Power Plant, Zhushan Power Plant and Nangan Power Plant (M01, M03) have all passed the application for operating license changes, and have completed the issuance of licenses. This year, all managed pollution sources have paid air pollution fees in accordance with regulations. A total of 3,016,751 yuan in pollution fees were levied in 2011. Various flue inspections and random tests were completed before the end of June. Our team has supervised the completion of flue inspections at each listed site, and the data from regular inspections has been reviewed and passed. In 2011, 113 catering businesses have been comprehensively inspected, and specialized counseling has been implemented for the operators of Shennongju Wedding Banquet Hall and Longfu Villa within the jurisdiction. At present, the inspection of 66 temples has been completed, and 4 were rated as excellent according to the census results. At the same time, publicity on reducing incense consumption was carried out for relevant festivals; for construction emission sources, 22 on-site related counseling sessions were conducted to establish fixed emission and construction engineering contractors in the county to implement air pollution prevention and improve fixed emission. Compliance rate of site and construction site management. This year, we assisted the bureau in carrying out construction waste inspection inspections. According to statistics, a total of 492 inspections have been completed by the end of December 2011. Some construction sites have received complaints from the public. Our team has carried out inspections and strengthened coaching work in accordance with the instructions of the bureau. . According to statistics on air pollution control fees for construction projects in 2011, the current collection amount is 6,182,183 yuan. The amount declared is mainly based on other construction projects as the main construction air pollution fee income, accounting for approximately 92.3% of the total construction air pollution fees this year; for mobile sources, today In the year, a total of 5,065 postcards were sent to notify the regular inspection of locomotives, and four outlying island inspection services were completed. At the same time, a total of 2,500 regional SMS notifications were sent each time, and a total of 488 regular inspection services were provided for outlying islands, including There were a total of 476 qualified vehicles, with a pass rate of 97.5%. After the implementation of regular inspections on outlying islands, the overall inspection rate increased compared with the previous year. The joint roadside inspection operation currently intercepts 140 motorcycles in total, and 35 uninspected vehicles were seized on site. After notification, the number has been improved to 30 vehicles; this year, the team conducts an average of 5 open-air burning inspections and regulations per month. Publicity work and regular inspections of open burning hot areas. A survey was conducted on military vehicles. After screening the valid vehicle registrations, the total number of vehicles under the control of the Ministry of Defense was 470. Some vehicles were scrapped this season. The overall regular inspection rate is currently 62.13%. Vehicles registered in Lianjiang County There are 51 vehicles, and the locomotive inspection rate is 74.51%.
Keyword
Air, Stationary air pollution source control, Mobile source control, Planning of air quality monitoring
Open
top