111 Tainan city Continuous Emission Monitoring Systems(CEMS) check and catering control plan

Absrtact
The Relative Accuracy Test Audit (RATA) completed 7 flues, and the completion rate was 100% . Checking of the error correction opacity (OP) completed 13 flues, with 100% completion rate; the Cylindrical Gas Audit (CGA) has completed 7 flues with the completion rate 100% , as for the check for dioxide conversion, a total of 5 flues is completed with the completion rate 100%, and the overall average conversion is 97.5%. Supervision and verification: Supervision and inspection work is carried out by the factory when the inspection is carried out by the factory to confirm whether the factory is actually implemented in accordance with the regulations. The Relative Accuracy Test Audit (RATA) completed 8 flues , and the completion rate was 100%. The error correction opacity (OP) completed 13 flues and the completion rate was 100%. The current regular inspection results All meet the requirements of laws and regulations. Monitoring data quality: Compared parallelly, within 7 days,6 flues have been completed with the completion rate 100%; in 30 days, 2 flue have been completed with the completion rate 100%. There is no abnormal situation in the implementation of parallel comparison results; monthly review is carried out regularly, and the daily and monthly report transmission rate and the percentage of effective monitoring hours are counted. Some factories may be lost or miss data due to abnormal data and hardware systems or abnormal power outage. The current daily and monthly transmission rates can reach 100%. In terms of monthly statements, most public and private venues can amend themselves according to the monthly review opinions; the efficiency in 2021 reaches more than 85%; and the difference between CEMS emissions and license qualification number are compared; if too large, the factory are asked to provide comparison data for licensing projects. Regarding compliance check: The regulatory compliance checks have been completed a total of 13 times with the 100% completion rate, in 2022; In addition, the tracking improvement work was continuously tracked, and the improvement situation of each factory was confirmed. If there were any factory flaws that included data calculation and the frequent personnel movement, the inspection and auxiliary operations were continuously strengthened to improve the compliance rate of each factory. In this project, we aim to reduce the environmental pollution caused by cooking and improper food/oil waste disposal in catering of Tainan City. Inspection, counseling and policy publicity are the ways of the implementation for the project. The inspection is primarily performed on the caterers who are large-scale, repeatedly reported to the authority and apt to produce pollution. Equipped with the particle mass profiler & counter, we can learn about the caterer’s general information, the status of how air and water pollution and food waste disposal go. We have inspected 393 caterers in this year, of which Chinese restaurants accounted for 78%. Additionally, accounting up for 81% of the installation rate. Publicizing the relevant policies is also performed during the inspections. As for counseling, we invited experts to assist the caterers who have seriously produced pollution and were consistently reported for improvement. According to experts’ advices, we set up a reasonable deadline so that the caterers could be well-prepared for the improvement. There were 30 caterers being offered counseling assistance in this year. Carry out 30 times of improvement and follow-up work of the industry after being tutored by experts. To handle the 111 years of Fuhua Night Market environmental protection night market. The selected 23 caterers shall be provided with grants to install EP systems, the installation rate reaches more than 60% of the appraisal specifications. It is expected that the shopping area plan may bring about the reduction of 482 kilogram of PM2.5 emission. In the light of the related publicity and consultations, we held one large-scale briefing session. In addition to cooperating with the control announcements, also printed 500 propaganda of the catering industry.
Keyword
Relative Accuracy Test Audit, opacity, Cylindrical Gas Audit, PM2.5
Open
top