A project of the operation of the air quality detective stations and the analyses of the air quality in the year of 2003

Absrtact
This project was carried out from 1st April 2003 to 31st Dec. 2003. The duration is 9 months. The objectives of this project are: (1) to properly maintain the air quality manpower stations (6 stations) and automatic station (1 station); (2) to carry out the work to termly maintain and revise the detective facilities; (3) to maintain the appropriate rate of facilities and to understand the changing trend of the air quality
Keyword
particulate,PSI,air quality